Turnover in the construction industry
According to the Companies Act, turnover is:
‘The amount derived from the provisions of goods or services within the company’s ordinary activities after deduction of trade discounts, VAT and other relevant taxes’.
In general terms, turnover is the total amount that a business bills to its clients, less any discounts, VAT, and so on. It includes amounts such as the shipping that is required, and any expenses that are billed to the client.
It is important to remember that turnover is determined when the goods and services are actually provided, rather than when they have been invoiced or when the cash has been received. As income from investments such as interest and dividend income is not derived from the provision of goods and services, these are not included in turnover.
Turnover determines when a business has to register to pay Value Added Tax (VAT). VAT is a tax added to the cost of certain goods and services. It is only accountable where the party raising an invoice is VAT registered. It is necessary to register if VAT-able turnover exceeds a minimum threshold in any 12-month period.
[edit] Related articles on Designing Buildings
- Accounting.
- Business plan.
- Business rates.
- Cash flow.
- Commercial management.
- Compound Annual Growth Rate (CAGR).
- Construction VAT.
- Final account.
- Goods and services.
- Invoice.
- Key performance indicators .
- Price.
- Profit.
- Relevant cost.
- Revenue.
- Solvency.
- Stamp duty.
- Supply.
- Taxation.
- Whole life costs.
Featured articles and news
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.