What you need to know when hiring a crane
Contents |
[edit] Introduction
If you are building anything high, you are likely to need a crane to complete it. Even smaller housing residences can need a crane for roofing. However, cranes are not uniform, and there are several types to choose from. In order not to make the wrong choice, you have to be aware of all the relevant factors when it comes to hiring a suitable crane.
[edit] Boom length and the tail swing
Since it is unlikely that you will build on an open meadow, your crane operator will have to navigate carefully. There are other buildings, power lines, and bridges that need to be avoided. That is why the crane has to have the right length of the boom at the front and not much of a tail swing at the back. Make the calculation of the diameter the crane can move and rotate within.
[edit] Decreasing the noise levels
Although construction can be quite noisy at times, regulations in most countries require you to keep the noise down. Cranes can be loud because of their size. Diesel-powered cranes are in general louder than the electrical ones. Choose the latter type to keep the noise to a minimum.
[edit] Hook line speed
If you are constructing a tall building, then look for cranes with high gear hook line speeds. This will ensure that the cargo gets to height faster. Of course, the crane should have enough power to lift heavy cargos.
[edit] Time limitations
In order to decrease the total cost, plan carefully when you are going to need a crane and how long it will be operational. In this way, you will avoid overspending on hire costs. For example, a tower crane needs to be disassembled if moving location and many engineers forget to add moving time into the total hours the crane is present at the construction site. Planning is crucial when it comes to limiting the time crane is used.
[edit] Liability
Accidents can happen. Be sure to apply all security and safety measures to prevent accidents, but if they do occur, you need to know who is responsible. Even a simple fender bender of a mobile crane will need to be paid out. That is why signing a liability contract is a good idea. This way, you as the client and the crane operating company will know exactly who is liable for which part of the job.
[edit] The type of crane You need
Basically, what you need the crane for, where it will work, and for how long will determine the type of the crane to hire. Telescoping cranes and truck mounted cranes are useful for short jobs that last only a few hours. If you need cranes for industrial use then you need overhead cranes, like the ones you can see in ports carrying shipping containers. Finally, tower cranes are most versatile and most common in high-rises.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Heat pumps, vehicle chargers and heating appliances must be sold with smart functionality.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
New-style degrees set for reformed ARB accreditation
Following the ARB Tomorrow's Architects competency outcomes for Architects.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.
Preserving, waterproofing and decorating buildings.
Many resources for visitors aswell as new features for members.
Using technology to empower communities
The Community data platform; capturing the DNA of a place and fostering participation, for better design.
Heat pump and wind turbine sound calculations for PDRs
MCS publish updated sound calculation standards for permitted development installations.
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.