Upfront carbon
Zero carbon building, Performance standard, Version 2, Published by the Canada Green Building Council in March 2021, defines upfront carbon as: 'The embodied carbon emissions caused in the materials production and construction stages (stages A1-5) of the life-cycle before the building begins to be used.’
Improving Consistency in Whole Life Carbon Assessment and Reporting, Carbon Definitions for the Built Environment, Buildings and Infrastructure, Version ‘A’, May 2021, published by WLCN, LETI and RIBA, states: ‘‘Upfront Carbon’ emissions are the GHG emissions associated with materials and construction processes up to practical completion (Modules A1-A5). Upfront carbon excludes the biogenic carbon sequestered in the installed products at practical completion.’
NB Life cycle modules are defined in BS EN 15978 and PAS2080 for infrastructure.
[edit] Related articles on Designing Buildings
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.