[edit] Introduction
When Stride Treglown set out to design The Courtyard, a development that hoped to offer retirement properties in Cornwall, they were met with both opportunities and challenges.
[edit] Overview
The site featured luscious greenery, was surrounded by interesting wildlife (including bats) and offered unparalleled views towards the sea, however the site was a mess. The historic buildings it was home to were dilapidated, it had become a dumping ground for building materials and it sloped down to the sea. In short, they had their work cut out for them.
The practice wanted to restore the existing structures – farm buildings and a Grade II listed clock tower – to their former glory but also offer modern units.
[edit] Carefully restored
I spoke to Ben Honey MCIAT, a chartered architectural technologist for Stride Treglown, about striking the right balance between redevelopment and conservation. He acknowledged that it had been a challenge but believed they had gotten it right.
Local stone was used on the existing buildings, and they were brought up to the modern standards of building regulations with a dispensation for the walls on preservation grounds. Although the buildings were not listed, the practice was keen to maintain their existing character.
Old farm buildings and a stable now house cottages. New builds on the site include mews cottages, apartments and houses. There are 38 residences on the site including those in the restored buildings.
Ben told me that it was “very difficult to replicate buildings of that age” so it was decided they would be complemented with modern units. Concrete frames and render were used for these apartments and houses. Render has been used for hundreds of years in Cornwall and compliments the stone of the old buildings.
It was important to keep different parties satisfied as the project progressed. The building inspector needed to see that structures had been made safe, whereas the heritage officer wanted to see the existing buildings on site maintain their historical character.
Strides also had to please another key stakeholder: the local community. With the buildings in a state of disrepair and the site having become a dumping ground, residents were happy to see it being worked on. However, they also wanted to make sure the site did not become “overdeveloped”.
The practice was ultimately able to please everyone. Ben is modest and keen to highlight the work of others who were involved.
[edit] Conservation techniques
He praised Stride Treglown conservation architect Paul Channing and the landscape architects that Strides worked with. The “balancing act” involved a collaboration between professionals, and this was key to the success of the project.
The buildings on the site have given it a new lease of life, but a lot of thought was put into the natural context of the development. Trees, sunlight, shade and wildlife were all considered. Ben told me that they wanted to maintain as much biodiversity as possible and not disrupt the natural environment.
On the southern boundary, large cypress, Turkey oak and sycamore trees have been retained even though this restricts potentially stunning sea views from some of the properties. This was a trade-off that the practice was very much aware of, but it believed that it was in the interests of everyone – including future residents – to make. Outdoor space gives residents a space to “not only use but also to share together”. They also have access to a wooded area on site through path links. A bat roost has been built on the southern boundary as part of the ecological strategy.
[edit] The role of chartered architectural technologists
Despite Ben’s modesty, having chartered architectural technologists involved in the project was clearly invaluable. They helped with technical design and were also involved in specifying different materials, such as breathable render. Having individuals able to help with this kind of detailing was important.
Architectural technologists were also involved with work on the outdoor spaces, providing advice on levels. This was crucial in the sloping environment. Ben and other architectural technologists ensured, for example, that ramps were coordinated with key features within the site and complied with regulations. Ben describes this as a challenge but tells me that ‘we got there in the end’ and once again recognises the work of the landscape architects.
After a COVID-19 related delay in 2020, work on the site resumed. The bold development not only offers beautiful views, but also showcases the value of professional collaboration and of course, that of chartered architectural technologists themselves.
This article originally appeared in the Architectural Technology Journal (at) issue 135 published by CIAT in fall 2020 the headline under the headline, 'The Courtyard'. It was written by James Evans, Communications & Digital Administrator.
--CIAT
[edit] Related articles on Designing Buildings
Featured articles and news
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Heat pumps, vehicle chargers and heating appliances must be sold with smart functionality.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
New-style degrees set for reformed ARB accreditation
Following the ARB Tomorrow's Architects competency outcomes for Architects.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.
Preserving, waterproofing and decorating buildings.
Many resources for visitors aswell as new features for members.
Using technology to empower communities
The Community data platform; capturing the DNA of a place and fostering participation, for better design.
Heat pump and wind turbine sound calculations for PDRs
MCS publish updated sound calculation standards for permitted development installations.
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.