Space planning
Space planning is an important part of building design and is used to determine how a space (or spaces) should be laid out and used. It may be undertaken as part of the building design process, or as a stand alone exercise looking at how best to plan an existing space, or a space that is being developed (for example, a tenant determining how to fit out their part of a new development). It can be used for very simple spaces such as hotel bedrooms, through to very complex industrial buildings.
Good space planning can improve the wellbeing and productivity of the occupants of a space.
Designers will consult with the client to clarify their requirements for the space before starting planning (and perhaps assess existing spaces), typically by considering issues such as:
- Budget and time constraints.
- The separation of activities into zones.
- The intended use/s of the space.
- The number of occupants.
- The space required per occupant.
- The main focal points of the space.
- The need for or availability of windows and doors.
- Access into and from the space, and the function of adjacent spaces.
- Circulation within the space.
- Access and use of the space for people with disabilities.
- The requirement for furniture, fixtures and fittings.
- The number of people who are likely to use the space.
- Whether the space should be balanced and symmetrical, unbalanced or a combination.
- Security, safety and privacy.
- Legislative requirements.
- Lighting IT and other building services requirements.
- Energy targets and sustainability requirements.
- Environmental requirements, such as noise, lighting, ventilation, temperature, and so on.
- Environmental controls.
- Welfare facilities.
- Views.
- Colours and branding.
- Planting.
- The need for flexibility or future growth.
Once considerations such as those listed above have been resolved, a space plan can be created.
There are various techniques that can be used to create a space plan. A common early technique is the ‘bubble plan’. This involves drawing a plan of the space and using ‘bubbles’, or circles, to roughly delineate the various activities that will take place, overlapping according to the relationship between them.
Once the activities have been defined and located in relation to one another, a more detailed scale plan can be drawn to show the layout of individual items within the space. This process can be carried out by hand, or with moveable paper cut outs, or using space planning software such as computer aided design (CAD) software or building information modelling software (BIM).
Parametric modelling can simplify space planning by allowing the automatic application of pre-defined rules to the entire space. So for example, if a colour scheme for particular part of the space is changed, every object that has that colour attribute will also change. Other parameters might include; positional data, dimensions, algorithms describing form, and so on.
In particularly complex spaces, techniques such as space syntax can allow the relationships between spatial layout and human behaviour to be simulated and investigated in detail. This might be useful, for example, in the design of a station where a great number of conflicting uses occupy the same space.
[edit] Related articles on Designing Buildings Wiki
- Ambiguous formalities in Architecture.
- Decoration.
- Design drawings.
- Furniture.
- Furniture fixtures and equipment FF&E.
- Interior designer.
- Lighting designer.
- Mood board.
- Office space planning.
- Section drawing.
- Space.
- Wellbeing and creativity in workplace design - case studies.
- Workplace as a Service WaaS.
Featured articles and news
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Comments