Solvency in the construction industry
‘Solvency’ describes the ability of a company to service its debts. In very simple terms, to be solvent, the value of a company’s assets must be greater than the sum of its debts.
A company that is not solvent can still continue to operate in the short term, for example, if the company takes on debt with the intention of expanding their operations and growing business. In the short term, they may be unable to service the debt from their existing assets. However, the creditor assumes that increased revenue from the investment will enable the company to service its debts in the longer-term.
Short-term solvency can be measured by the current ratio – calculated by dividing current assets by current liabilities. The solvency ratio can be used to measure longer-term solvency – calculated by dividing the company’s net income + depreciation by its long term and short term liabilities.
In the UK, an insolvent company is one that is unable to service its debts. Insolvent companies may be put into 'liquidation' or 'administration'.
For more information, see Insolvency in the construction industry.
Solvency is not the same as liquidity, which refers to the availability of liquid assets (i.e. cash), and how easy it is for other assets to be converted to cash.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.