Service level specification SLS
A service level specification (SLS) forms part of a service level agreement (SLA), in which the standards required of a service provider are set out.
SLAs can be prepared by an organisation when they require services from an in-house team or department, or they may be used for the outsourcing of services, such as facilities management services, for example; property management, inspection and repair services, planned and responsive maintenance, cleaning, portering, security, ICT services, and so on.
The SLS quantifies the minimum acceptable (technical) standard of service that is required. Performance measurement in terms of the standards laid out in the SLS can be considered in terms of critical success factors and key performance indicators. For example, the SLS in a cleaning contract could describe the maximum amount of dust or debris which is permitted to remain following cleaning, as part of the overall standard of cleaning to be achieved.
The SLS should set out:
- Internal standards relating to policy.
- External standards including; statutory requirements, industry an international standards, manufacturers’ recommendations and so on.
- The required technical standards and the procedures that must be complied with.
- Quality and performance targets.
The level of detail included in the SLS will depend on the service required and its complexity, however, its contents might include:
- Definition of terms.
- Scope of areas, items and services covered by specification.
- Legal/regulatory requirements.
- Manufacturers' recommendations.
- Industry accepted best practice.
- Corporate/departmental requirements.
- Established standards/codes.
- Procedures for each area, item and service.
- Frequency of procedures for each area, item and service.
If organisations are defining and specifying their requirements for the first time, there can be a risk that they incur higher costs as a result of over-specifying the service (compared with wha was in place previously). Value management can help safeguard against this by ensuring that only services that are genuinely of value are specified.
SLSs should not be regarded as fixed but are capable of being continuously improved as circumstances and requirements change and experience allows changes in specification to yield better results and improved value. Clear and open communication with the service provider is essential to optimise this process.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Home builders call for suspension of Building Safety Levy
HBF with over 100 home builders write to the Chancellor.
CIOB Apprentice of the Year 2024/2025
CIOB names James Monk a quantity surveyor from Cambridge as the winner.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
Treasury responds to sector submission on Warm Homes
Trade associations call on Government to make good on manifesto pledge for the upgrading of 5 million homes.
A tour through Robotic Installation Systems for Elevators, Innovation Labs, MetaCore and PORT tech.
A dynamic brand built for impact stitched into BSRIA’s building fabric.
BS 9991:2024 and the recently published CLC advisory note
Fire safety in the design, management and use of residential buildings. Code of practice.