Optimiser
An optimiser is a control system employing an optimum start algorithm.
Optimum start is: ‘…a control system or algorithm which starts plant operation at the latest time possible to achieve specified conditions at the start of the occupancy period.’
Optimum stop is: ‘…a control system or algorithm which stops plant operation at the earliest possible time such that internal conditions will not deteriorate beyond preset limits by the end of the occupancy period.’
Ref Non-domestic Building Services Compliance Guide For Scotland, 2015 Edition v1.1, published by the Scottish Government, Building Standards Division in April 2018.
The Illustrated Guide to Mechanical Building Services, Third Edition (BG 31/2017), by David Bleicher, published by BSRIA in 2017, describes an optimiser as: ‘…a time switch which can control the length of time needed to pre-heat a space before the start of the occupancy period. It does this by measuring the internal and external temperatures and calculating the point at which the heating plant needs to be switched on. The advantage that optimisers have over conventional time switches is that excessive pre-heating during mild weather is avoided and energy is saved. In practice, the optimiser is usually combined with a compensator in a single unit.’
See also: Optimiser control.
[edit] Related articles on Designing Buildings
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.