Certificate of occupancy
In the United States, a certificate of occupancy (also known as a use-and-occupancy certificate) is a document issued by a local government agency or building department to confirm that a building is fit for human occupation.
The procedures involved in the certificates vary according to the jurisdiction and the type of building. The most common situations in which a certificate is required include:
- Construction of a new building or structure.
- Conversion of a building from one use to another.
- Change of ownership.
- Significant alteration to a building.
There are several reasons for obtaining a certificate of occupancy, including:
- To legally affirm that the building is in a habitable condition.
- To confirm that the building has been constructed and maintained in accordance with building codes and the specifications that were submitted to the local authority before construction began.
- To confirm the building’s classification of use.
- To enable the building to be sold legally.
The certificate will not be issued until all inspection requirements have been passed and any fines have been paid in full. Inspections often focus on ensuring that the building complies with fire safety codes, installation of services has been done correctly, and the building is structurally capable of withstanding likely seismic activity, and so on.
A temporary certificate of occupancy may be obtained which provides the same rights as an ordinary certificate but for a fixed period of time, which can vary from 30 to 90 days depending on the jurisdiction that issues it. Once it expires, the building owner can re-apply for another temporary certificate if required, for example, if the building is still undergoing construction work while part has been completed and is capable of being occupied.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.