Letter of appointment for consultants
Letters of appointment (or letters of acceptance, or letter contracts) are sometimes used to appoint consultants in cases when a client wants the consultant to start work quickly, while a full contract is being prepared.
The letter should put a time limit on its validity and make it clear a contract will supersede and replace anything expressed in the letter of appointment.
Ideally the letter should include:
- A brief description of the project.
- A scope of work to be undertaken.
- The fee (excluding VAT) to be paid within the time period, and when it is to be paid.
- Allowable expenses.
- The date for the start of work and the period covered by the letter.
- The right of the client to use material generated in the time period.
- A statement that the letter is an interim arrangement to be substituted by a contract.
- A statement that there is no guarantee to extend the appointment beyond the time period stated.
- The amount of professional indemnity insurance cover required for the project.
- The named staff or sub-consultants who will carry out the commission.
- The consultant’s reporting lines within the client organisation.
- A statement allowing termination of the agreement at will by either party, but with a fair proportion of the fee to be paid by the client as well as properly incurred and recorded expenses.
- A statement confirming that unresolved disputes will be settled by adjudication under English Law.
Letters of appointment may also be appropriate if a consultant is required for a very insubstantial or minor commission where a full-blown contract could be seen as heavy handed and off-putting. This also applies to small side-projects such as commissioning a sculpture from a particular artist. In such circumstances, many of the items listed above should be included in the letter, together with a programme and budget.
The appointment letter should be duplicated for the consultant’s retention and return. It should have an acceptance clause for the consultant’s signature at the end and the consultant should be asked to initial the foot of each page.
NB Contractors are treated slightly differently, using a letter of intent for temporary purposes prior to engrossment and execution of contract documents. See Letter of intent for more information.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.