Letter of appointment for consultants
Letters of appointment (or letters of acceptance, or letter contracts) are sometimes used to appoint consultants in cases when a client wants the consultant to start work quickly, while a full contract is being prepared.
The letter should put a time limit on its validity and make it clear a contract will supersede and replace anything expressed in the letter of appointment.
Ideally the letter should include:
- A brief description of the project.
- A scope of work to be undertaken.
- The fee (excluding VAT) to be paid within the time period, and when it is to be paid.
- Allowable expenses.
- The date for the start of work and the period covered by the letter.
- The right of the client to use material generated in the time period.
- A statement that the letter is an interim arrangement to be substituted by a contract.
- A statement that there is no guarantee to extend the appointment beyond the time period stated.
- The amount of professional indemnity insurance cover required for the project.
- The named staff or sub-consultants who will carry out the commission.
- The consultant’s reporting lines within the client organisation.
- A statement allowing termination of the agreement at will by either party, but with a fair proportion of the fee to be paid by the client as well as properly incurred and recorded expenses.
- A statement confirming that unresolved disputes will be settled by adjudication under English Law.
Letters of appointment may also be appropriate if a consultant is required for a very insubstantial or minor commission where a full-blown contract could be seen as heavy handed and off-putting. This also applies to small side-projects such as commissioning a sculpture from a particular artist. In such circumstances, many of the items listed above should be included in the letter, together with a programme and budget.
The appointment letter should be duplicated for the consultant’s retention and return. It should have an acceptance clause for the consultant’s signature at the end and the consultant should be asked to initial the foot of each page.
NB Contractors are treated slightly differently, using a letter of intent for temporary purposes prior to engrossment and execution of contract documents. See Letter of intent for more information.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.