The LETI Embodied Carbon Primer; Supplementary guidance to the Climate Emergency Design Guide is represents LETI’sunderstanding of how designers need to be designing to meet the climate change targets in 2020. It is intended the primer will evolve over time, reflecting changes in carbon budgets, technologies and the capability of industry.
It outlines in detail the magnitude and challenges and the approach taken by LETI to establish guidance. It also summarises the actions to be taken at each RIBA design stage as well as the requirements of four key UK building archetypes in relation to embodied carbon reductions.
For further information and to download the LETI Embodied Carbon Primer Overlay to the RIBA plan of work visit here.
[edit] Related articles on Designing Buildings
- BIM outline plan of work.
- Comparison of BIM work stages.
- Comparison of work stages.
- Digital plan of work.
- Designing Buildings Wiki project plans.
- Governance for Railway Investment Projects (GRIP).
- OGC gateway review.
- Plan of work
- Project lifecycle for major road projects.
- RIBA Plan of Work for Fire Safety.
- RIBA plan of work v project plans v OGC gateways.
- RIBA.
- RIBA plan of work.
- The construction playbook.
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February