Onerous contract
Contents |
[edit] Introduction
An onerous contract (sometimes referred to as a loss making contract) can occur when the cost of meeting the obligations agreed under the contract exceeds the anticipated economic benefit to be received.
[edit] IAS 37
The International Accounting Standard 37: Provisions, Contingent Liabilities and Contingent Assets, or IAS 37, is an international financial reporting standard that applies to practices associated with onerous contracts.
In May 2020, the IAS Board issued Onerous Contracts - Cost of Fulfilling a Contract as amendments to IAS 37. The amendments specify which costs an entity includes in determining the cost of fulfilling a contract for the purpose of assessing whether the contract is onerous.
[edit] Onerous contracts and the Sourcing playbook
An onerous contract may be apparent from the beginning of the project, or it can become apparent due to changes in availability, unpredictable costs or other unavoidable circumstances.
The Sourcing Playbook, Government Guidance on service delivery, including outsourcing, insourcing, mixed economy sourcing and contracting, explains that onerous (or loss making) contracts may be “a possible consequence of getting risk allocation and payment mechanisms wrong. When a contract is publicly designated by a supplier as onerous, this should prompt a root cause analysis and a conversation with the supplier about the options available to address this.”
The Sourcing playbook was produced by the Cabinet Office and published in May 2021. It emphasises that the delivery of public services is a collaborative endeavour involving colleagues from commercial, finance, project delivery, policy and other professions. It captures best practices from across the Government within 11 key policies that all central departments are expected to follow.
For more information see: The Sourcing Playbook.
[edit] Related articles on Designing Buildings Wiki
- CLC urges inclusion of fluctuations provisions in contracts.
- Construction contract.
- Collateral warranties for building design and construction.
- Practical considerations of collateral warranties.
- Recovery of third party losses.
- Sourcing playbook.
- Supply chains in construction.
[edit] External resources
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.