Hub and spoke model
Contents |
[edit] Introduction
The hub and spoke model describes the general idea of creating a central hub or core with numerous secondary locations in strategically placed outlying regions. The hub and spoke distribution paradigm was introduced by the U.S. airline industry and has been successfully used by other sectors - such as shipping and transportation - since the 1970s.
[edit] History
In 1955, the U.S. aviation company, Delta Air Lines, set up the city of Atlanta, Georgia as its hub. The city served as a transfer point for passengers to make their way to their final destination. The model was considered to be more efficient since it allowed Delta to concentrate passenger traffic, equipment and operations in one location.
In the late 1970s, the hub and spoke concept was introduced in the tech sector. Referred to as ‘star networks’, the hub and spoke model was used as a method of configuring computer networks.
[edit] Hub and spoke model for businesses
Other businesses have explored the idea of adopting the hub and spoke model for their workplaces. Under this model, organisations establish a central headquarters location - usually in a strategic place or city centre - which acts as the hub. Spokes are then be set up in locations based on several factors, including talent availability, client base and so on.
The city centre hub serves as the front door of the organisation, where client and larger team meetings can be held. Spokes are smaller, more flexible offices that are located closer to where staff members live. They may be set up as co-working spaces that offer even more flexibility for different teams.
[edit] Changes brought about by COVID-19
According to the results of a Summer 2020 survey conducted by PwC, global CEOs believe the move towards remote working, automation and low-density offices are here to stay. The survey shows the majority of CEOs believe that COVID-19 pandemic driven shifts towards remote collaboration (78%), automation (76%) and fewer people working from offices (61%) will not go away once the pandemic is resolved.
As a result, more businesses may be considering the hub and spoke configuration. With a decrease in the number of people in the workplace, the idea of a large headquarters building centrally located in a major city may be less viable for some organisations.
By using a decentralised hub and spoke model, organisations may be able to allow employees to work from a strategic spoke location, ideally reducing their commute and expenses. The central hub then would be set aside as dedicated workspaces for those employees who prefer to work in a traditional office.
This modified configuration will allow businesses to move out of expensive and oversized city centre office spaces and explore the possibility of expanding their customer base in small, regional offices in new territories. It will also give employers the option to hire staff from other parts of the country who had never considered this possibility due to commutation distances.
The hub and spoke model has been in use for some time - particularly with the high price of commercial real estate in some cities. However, some have found it more difficult to manage aspects such as health and safety, equipment needs, IT security and other administrative tasks.
[edit] Related articles on Designing Buildings Wiki
- CEOs predict COVID-19 workplace changes will be permanent.
- City centre.
- Collaboration needed to deliver national and regional transport strategies.
- Creating more socially just and diverse cities.
- The compact sustainable city.
- Open plan offices.
- Pandemic migration.
- Post pandemic places report.
- The compact sustainable city.
- Urban design.
- Workplaces of the future.
Featured articles and news
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.