Balcony
According to the International Property Measurement Standards (IPMS): Residential Buildings, published by the International Property Measurement Standards Coalition (IPMSC) in September 2016, a balcony is:
An external platform at an upper floor level with a balustrade to the open sides projecting from or recessed from an external wall and including in this definition generally accessible rooftop terraces and galleries and loggia. |
[edit] Related articles on Designing Buildings Wiki
- Balcony repairs for period homes.
- BS 8579:2020 Guide to the design of balconies and terraces.
- Catwalk.
- Common balcony.
- Common facilities.
- Covered area.
- Floor area.
- International Property Measurement Standards.
- Loading bay.
- Mezzanine.
- Mezzanine floors.
- Patio.
- Shot Blasting for Balcony Restoration.
- Specify with caution to new BS 8579:2020
- Veranda.
- Widow's walk.
Featured articles and news
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building 2024 judges choice winner
Once Upon a Pass by Liam Man.
CIOB Art of Building 2024 public choice winner
Fresco School by Roman Robroek.
HE expands finance alliance to boost SME house building
Project follows on from Habiko public-private place making pension partnership for affordable housing delivery.
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
How orchards can influence planning and development.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.