Specify with caution to new BS 8579:2020
Contents |
[edit] Introduction
Designers working on high-rise residential projects are being advised to specify with caution to meet the fire requirements of a new British Standard. BS 8579 Guide to the Design of Balconies and Terraces was released at the end of August 2020, but developers and main contractors were already understood to be upgrading completed and signed-off flat developments before this in order to deliver the Class A fire performance at 18m+ they anticipated to be detailed in the new standard.
[edit] Product offerings under review
Whilst such moves are to be applauded, there are industry concerns that a 'double whammy' of implementing the new standard and new, unfamiliar products coming to market could jeopardise safety.
"This situation has the potential to affect a wide range of building components within balcony and terrace construction," said Julian Thurbin, of specialist building products manufacturer Wallbarn. "We are receiving high volumes of calls from construction professionals, including designers and cost engineers, requiring guidance on the products that can – and cannot – be considered.
"We have also heard reports of completed and fully legal products being revised with exterior materials, including balcony constructions, removed post sign-off and replaced with Class A systems – in extreme cases across the entire project and not just 18m and above. It highlights the importance parties are placing on delivering safe, compliant buildings and underlines the need to be absolutely sure only the best quality products and systems make it to site," added Julian.
[edit] Performance testing
To achieve the fire performance required by BS 8579, specifications will have to change. Manufacturers are responding with Class A product developments but concerns remain that some of the new solutions coming to market may not be adequately tested or designed for use at height and/or outdoors.
"Our sector is a really good example," said Julian. "Traditionally heavy duty plastic pedestals have been specified to support suspended balcony or terrace decking and paving. To achieve Class A performance these pedestals must now be metal. We have achieved this with our new product MetalPad, which is fully tested and fit for purpose. From sampling the market we have concerns that not all products offer the level of performance we feel is required, with some modified from interior usage and others utilising plastic or rubber parts, which are obviously combustible.
"There's also the question of product testing – in the case of pedestals load-bearing is critical – which we appreciate is a challenge. However, our advice is always to consult with your original supplier (whatever the product and even if they do not supply a Class A alternative) to at least understand the questions you should be asking of a new supplier.
"Safety is of prime importance and we do not want to be in a situation where, in our efforts to increase fire safety standards, we replace fully tested and compliant products with those that may not have been properly tested or are of a poorer quality," added Julian.
"Given that this issue centres around outdoor structures mounted 18m or more above ground level, industry concerns about product performance must be given serious consideration; system failure at height has the potential to have tragic consequences."
This article originally appeared on the CIAT website. It was published on 14 September 2020.
--CIAT
[edit] Related articles on Designing Buildings Wiki
- Balcony.
- British Standards Institution BSI.
- BS 8579:2020 Guide to the design of balconies and terraces.
- BS 9999: Code of practice for fire safety in the design, management and use of buildings.
- Building regulations.
- CIAT articles.
- Fire risk in high-rise and super high-rise buildings DG 533.
- Higher risk residential buildings.
- High-rise building.
- Veranda.
Featured articles and news
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Tackling the lack of knowledge or confidence in heat pumps
The CICV Green Home Festival part of the Edinburgh Fringe.
Home improvements swapped for green energy upgrades
As applications down since and desire to reduce bills up.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
The Use of Natural Insulation Materials in Retrofit
New paper from STBA with support from SDF.
National Retrofit Hub in partnership with InstallerSHOW.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.
Biodiversity and the built environment digital series
The nature of building, with CIOB and CWP.
A call for prevention and sensitive re-use.
Risks to the long-term effectiveness of the BNG scheme
National Audit Office publish review of Biodiversity Net Gain.
The CIAT principal designer register
Providing assurance and verification of the capability and competence of registered ATs.
Building Safety recommendations and Northern Ireland
The NI roadmap to improving safety in high rise residential.
Specifying rendered external wall insulation for fire safety
How to interrogate the evidence provided to the specifier.
The benefits of writing articles for your organisation
How to create a profile for your organisation and publish for free.
Scottish Government action to reach net-zero targets
Retrofit expert group highlight critical actions needed.
A forward thinking, inclusive global community of members.