GC Works contracts
The suite of standard Government Conditions of contract, GC Works, is still available; however, it is no longer being updated by the government, who has moved to the New Engineering Contract, now in its fourth edition (NEC4).
The GC Works contracts were created primarily for government projects, but could be used in the private sector. They were published by the Stationery Office for the Property Advisors for the Civil Estate (PACE).
The suite of contracts comprised:
- GC Works 1: Without quantities.
- GC Works 1: With quantities.
- GC Works 1: Single-stage design and build.
- GC Works 1: Model forms and commentary.
- GC Works 1: Two-stage design and build.
- GC Works 1: Construction management trade contract with quantities.
- GC Works 1: Construction management trade contract without quantities.
- GC Works 2: Minor works.
- GC Works 3: Contract for mechanical and electrical engineering works.
- GC Works 4: Contract for building, small works.
In addition, there were a range of supporting documents such as; sub-contracts, forms of tender, invitation to tender, performance bonds, parent company guarantees, retention bonds, notices and certificates.
[edit] Related articles
- Contracts.
- Contract conditions.
- CPC2013.
- Government departments responsibility for construction.
- JCT.
- Modifying clauses in standard forms of contract.
- Minor works contract.
- NEC3.
- Procurement route.
- Sub-contract.
[edit] External references
- Fenwick Elliot: Know your contract. November 2009.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.