Flow battery
Energy Storage in Buildings, A Technology Overview (BG 73/2018), written by John Piggott and published by BSRIA in March 2018, sates: ‘A flow battery is a specific type of battery in which the chemicals (which have a negative electrical charge) are kept in a solution which flows over the positively charged anode. This means that the chemicals at the anode are kept ‘fresh’ so that the battery produces a steady, continuous electrical current. A flow battery is effectively a battery that has moving parts which can be serviced and replaced. In a non-flow or ‘fixed’ battery, the chemicals are held in position, so that as the battery discharges, the electrical current can reduce prematurely because the chemicals nearest to the anode become exhausted. The fresh chemicals that are further away from the anode have to migrate through a layer of their depleted neighbours. This becomes progressively more difficult as more and more of the chemicals become exhausted. In some cases, this leads to a memory effect, when the battery becomes progressively less effective as it goes through its discharge/ recharge cycle. This is known as voltage depression…’
--BSRIA
[edit] Related articles on Designing Buildings
Featured articles and news
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.