Rising main
A "rising main" is a vertical pipeline or pipework that carries water or other fluids under pressure upwards from a lower to a higher level. It might be used for:
- Water supply, in multi-story buildings, transporting potable water from a ground-level pump or main supply up to higher floors usually to a water cistern in the roof. This ensures that water pressure is maintained across all levels of the building.
- Pumping wastewater or sewage uphill from a low-lying area to a treatment facility or sewer system. This is particularly useful where gravity-based systems are not feasible due to topography.
- Fire protection, (sometimes called a dry riser or wet riser) where a vertical pipe allows water to be quickly delivered to various floors in case of fire. Dry risers are kept empty but can be charged with water by the fire brigade, while wet risers are kept full of water for immediate use.
Planning Gateway One - Glossary, published on the Planning Portal, defines a rising main/falling main as a: ‘Vertical pipe installed in high buildings for the supply of water for firefighting’
[edit] Related articles on Designing Buildings
Featured articles and news
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.