Preparing an environmental policy (or environmental policy statement) is often the first stage in setting and managing environmental objectives for a company or project.
Generally an environmental policy will be part of an environmental management system (EMS) and will sit within a hierarchical suite of documents:
The environmental policy is the over-arching high-level statement of mission and principles in relation to environmental performance and management. It creates the framework for setting environmental objectives and targets and is often a public document.
It is generally a short document (usually one page) and may make general statements about adopting a particular approach to environmental management as well as more specific commitments in relation to areas that might be of particular importance, such as energy use, waste management, the reduction of pollution, compliance with best practice, training and so on (although detailed targets and objectives should appear in the environmental plan, not the environmental policy). It may also commit to adopting a specific Environmental Management System (EMS) such as ISO 14001.
The policy should be signed by a senior director in order to demonstrate commitment and should be dated, and reviewed regularly (usually annually) to take account of changes in organisation, legislation, and so on.
Corporate environmental policies are increasingly common as they are often a requirement of an invitation to tender (along with other policy documents such as equal opportunities, health and safety, corporate social responsibility and so on). Environmental policy templates do exist, but can be so generic as to be meaningless and unless they are supported by a properly thought out environmental management system, they are unlikely to produce beneficial effects.
A specific project, such as a construction project, might adopt a corporate environmental policy, or a project-specific policy might be prepared.
It is important that everyone involved in the project is aware of the environmental policy and environmental plan, and that they are bound by their requirements. Appointment documents should make clear the extent and standard of environmental performance and assessment that is required as well as requirements for monitoring and reporting. These requirements need to be cascaded down throughout the entire supply chain.
This means that a company may have to prepare a project-specific environmental policy to comply with the requirements of an invitation to tender.
Environmental policies should not just be warm words, sat on a shelf or on a distant page of a website. If an environmental policy makes commitments, then the environmental plan should set out how these will be tested and a system put in place to ensure that those tests are undertaken, results are fed back and the policy reviewed to assess whether commitments are being met and whether changes need to be made.
Environmental management systems require policing, and this can be done at a number of different levels:
- A senior client champion should be appointed to take responsibility for environmental matters.
- A client environmental representative should be appointed to manage environmental matters on a day to day basis. On a large project this can be a full-time job for a specialist.
- Contractor’s environmental manager.
- Contractor’s site environmental representative.
- Contractor’s site foreman.
These individuals need to carry out regular inspections, audits and reporting and must be empowered in order to be effective. It is all too easy to ignore environmental requirements, particularly when there are time or budgetary pressures, or when ‘emergencies’ crop up.
[edit] Related articles on Designing Buildings
- Chain of custody.
- Changing lifestyles.
- Climate change science.
- Construction environmental management plan.
- Deleterious materials.
- Ecological impact assessment.
- Eco-Management and Audit Scheme EMAS.
- Energy targets.
- Environmental consultant.
- Environmental impact.
- Environmental impact assessment.
- Environmental legislation.
- Environmental management system.
- Environmental plan.
- Site waste management plan.
- Sustainability.
- Sustainability outcomes.
- Sustainable materials.
- Sustainable Development Goals and the triple bottom line
- Sustainable urban drainage systems.
- Whole life costs.
- Zero carbon homes.
- Zero carbon non-domestic buildings.
[edit] External references
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.