Schedule of drawings
A schedule of drawings is an itemised list of drawings required for a building project. It can be included as part of an invitation to tender, or may be prepared as part of a design management plan. A schedule of drawings may include all the drawings required for a project, or on larger, more complex projects, it may be specifically prepared for a certain discipline, specialist or for a particular aspect of the works (such as a planning application).
It may include:
- Project name.
- Drawing types and purposes.
- Drawing numbers and revisions.
- Drawing titles.
- Drawing originators.
- Drawing formats.
- Drawing locations.
- Scales.
- Original sizes.
- Dates prepared, issued or required.
- Additional notes.
The information set out on drawing schedules may be replicated in a title box on the actual drawings themselves.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Adapting to meet changing needs.
London Build: A festival of construction
Co-located with the London Build Fire & Security Expo.
Tasked with locating groups of 10,000 homes with opportunity.
Delivering radical reform in the UK energy market
What are the benefits, barriers and underlying principles.
Information Management Initiative IMI
Building sector-transforming capabilities in emerging technologies.
Recent study of UK households reveals chilling home truths
Poor insulation, EPC knowledge and lack of understanding as to what retrofit might offer.
Embodied Carbon in the Built Environment
Overview, regulations, detail calculations and much more.
Why the construction sector must embrace workplace mental health support
Let’s talk; more importantly now, than ever.
Refurbishment for net zero; the BSRIA white paper
The everyday practice of tackling energy efficiency, fabric first, ventilation, air quality, and occupant wellbeing.
Ensuring the trustworthiness of AI systems
A key growth area, including impacts for construction.
Foundations for the Future: A new model for social housing
To create a social housing pipeline, that reduces the need for continuous government funding.
Mutual Investment Models or MIMs
PPP or PFI, enhanced for public interest by the Welsh Government.
Stress Awareness Week ends but employer legal duties continue.
A call to follow the five Rs for the business and for the staff.
Key points and relevance to construction of meeting, due to reconvene.
Cladding remediation programmes, transparency and target date.
National Audit Office issue report on cladding remediation.