Design build operate (DBO)
A design build operate (DBO) contract is a project delivery model in which a single contractor is appointed to design and build a project and then to operate it for a period of time.
The common form of such a contract is a public private partnership (PPP), in which a public client (e.g. government or public agency) enters into a contract with a private contractor to design, build and then operate the project, while the client finances the project and retains ownership.
This differs from a design build finance and operate (DBFO) contract in which the contractor also finances the project and leases it to the client for an agreed period (perhaps 30 years) after which the development reverts to the client.
It also differs from the traditional design and build contract in that it includes operation and maintenance of the completed works, which means that the contractor’s duties and responsibilities to the client do not end at final acceptance but continue through a defined operational term.
In theory, this encourages the contractor to develop a project with its long-term performance in mind from the outset, rather than just considering the efficiency of its construction, as the contractor will be responsible for any high operating, maintenance or repairs bills. However, it ties both the client and the contractor into a very long-term relationship that can be difficult to price. As a result, contractors may price considerable risk into their tenders, and so the client may not always achieve a best value outcome.
NEC4 Design, Build and Operate Contract (DBO) was released in 2017. This is not only intended for the 'traditional' DBO approach, but is also available for situations in which a client wants to have an existing facility or asset operated by the contractor while it is being upgraded or extended.
[edit] Related articles on Designing Buildings Wiki
- Build lease transfer BLT.
- Build, own, operate and transfer (BOOT).
- Complex project.
- Construction contractor.
- Construction management.
- Design and build.
- Design and build - pros and cons.
- Design build finance and operate.
- Design Build Finance Transfer (DBFT).
- Design build operate maintain DBOM.
- Integrated project delivery (IPD).
- Major project construction contract.
- NEC4 Design, Build and Operate Contract.
- Private Finance Initiative.
- Procurement route.
- Public Private Partnership.
- Public procurement.
- Renovate, operate, transfer (ROT).
- Risk allocation.
Featured articles and news
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Heat pumps, vehicle chargers and heating appliances must be sold with smart functionality.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
New-style degrees set for reformed ARB accreditation
Following the ARB Tomorrow's Architects competency outcomes for Architects.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.
Preserving, waterproofing and decorating buildings.
Many resources for visitors aswell as new features for members.
Using technology to empower communities
The Community data platform; capturing the DNA of a place and fostering participation, for better design.
Heat pump and wind turbine sound calculations for PDRs
MCS publish updated sound calculation standards for permitted development installations.
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.