Customs guarantee
A customs guarantee is a financial tool that helps construction companies manage their cash flow and operations efficiently while ensuring compliance with UK customs regulations. It is a form of financial assurance provided to HM Revenue and Customs (HMRC) to cover any potential customs duties, VAT, or other taxes and charges that may be due on goods imported into the UK.
For construction projects, this might be relevant when importing construction materials, machinery, or equipment from abroad. The customs guarantee ensures that the importer (often the construction company or a related party) complies with customs regulations and that the UK government will receive any due payments even if the importer is unable to pay later. It allows goods to be released from customs without immediate payment of duties, taxes, or VAT, facilitating smoother and faster operations in construction projects.
The guarantee can be in the form of a bank guarantee, insurance policy, or cash deposit. It must be acceptable to HMRC and cover the potential liabilities. In construction, where timelines are tight and materials are often imported, having a customs guarantee can be crucial for avoiding delays that might otherwise occur while waiting for customs clearance.
[edit] Related articles on Designing Buildings
- 5 Essential Tips for the Import / Export Trade
- Advance payment bond.
- Bonds and guarantees.
- Brexit.
- Cash flow.
- Guarantee.
- Late payment.
- Parent company guarantee.
- Performance bonds.
- Retention of title.
- Vesting certificate.
[edit] External references
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.