Customer representative
Construction Quality Planning Guide, Draft for Consultation, Published by the Construction Innovation Hub in May 2020, defines the Customer Representative (CRe) as: ‘…the responsible and accountable person for monitoring the overall progress associated with the CQP (Construction Quality Planning) process. This role sits within the organisation that is responsible for the overall quality requirements for the project i.e., is accountable to the client. Depending on the nature of the procurement contract, different organisations may be delegated to have this responsibility. The CRe provides the final signature to approve the supply chain as production ready for the project or future projects. This term is synonymous to ‘Client Representative’.’
[edit] Related articles on Designing Buildings
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.