Coronavirus impact survey
On 17 March 2020 an engineering services industry survey was launched by ECA, BESA and SELECT. A summary of the findings can be found here: Survey records business projections after coronavirus storm.
The survey aims to obtain an early picture of the current and anticipated business impact in the engineering services sector and its supply chain, to enable effective representation and advice on important issues.
ECA Director of CSR Paul Reeve commented: “Coronavirus is a fast-moving situation with significant social and economic implications. It is vital that we understand the key problems being faced by companies and how to both represent and practically support our industry in what is fast becoming a changeable and challenging near future.”
BESA Director of Legal and Commercial Debbie Petford added: “Our biggest challenge is ensuring our members have certainty in this extraordinary and evolving situation – especially when we do not yet know how long it will last or what extent the economic impact will be. We have already provided guidance on a range of topics on our website but this survey is necessary to ensure nothing is overlooked.”
The survey comes as Build UK and CECA have stated that construction ‘sites may have to close’ due to coronavirus. The two bodies will be asking Government to ‘identify safety critical work on the infrastructure network that is essential and must be continued’.
The survey, which is completely confidential, should take around three minutes complete. The initial deadline for responses is Friday March 27 2020 at 4pm.
The survey can be completed here - www.surveymonkey.co.uk/r/2CWB95Z
ECA is monitoring the situation closely and has created an employer advice portal at www.eca.co.uk/coronavirus. Likewise all updates and advice about the Coronavirus from BESA are available at https://www.thebesa.com/coronavirus-updates/.
--ECA
[edit] Related articles on Designing Buildings Wiki
- Budget 2020.
- Coronavirus.
- Coronavirus and force majeure.
- Coronavirus job retention scheme.
- Designing HVAC to resist harmful pathogenic microorganisms (bacteria and viruses such as influenza and 2019-nCov)
- ECA articles.
- Survey records business projections after coronavirus storm.
- The future of the coronavirus furlough.
- Understanding mental health in the built environment.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.