Construction management: outline work plan
This is an outline plan for a project following a construction management procurement route. Project plans for other procurement routes are available by clicking here.
Clicking on any of the stages will take you to the detailed tasks necessary to complete that stage. Together the tasks represent a single, consolidated project plan from the first moment it becomes apparent a project might be required right through to final evaluation of the completed project.
Construction management
Stage 1: Business justification.
Stage 2: Feasibility studies.
Stage 3: Project brief.
Stage 4: Concept design.
Stage 5: Appointing the construction manager.
Stage 6: Detailed design.
Stage 7: Production information.
Stage 8: Tender trade contracts.
Stage 9: Mobilisation.
Stage 10: Construction.
Stage 11: Occupation and defects liability period.
Stage 12: Post occupation evaluation.
Moveable stages:
Featured articles and news
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Heat pumps, vehicle chargers and heating appliances must be sold with smart functionality.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
New-style degrees set for reformed ARB accreditation
Following the ARB Tomorrow's Architects competency outcomes for Architects.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.
Preserving, waterproofing and decorating buildings.
Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.
Creating an outline work plan for construction management involves breaking down the project into manageable tasks and organizing them in a logical sequence. Here is a general outline of a work plan for construction management:
1. Project Initiation:
- Define project objectives, scope, and deliverables.
- Identify project stakeholders and establish communication channels.
- Conduct initial site assessment and feasibility studies.
- Develop project budget and timeline.
2. Pre-Construction Phase:
- Obtain necessary permits and approvals.
- Select and contract with architects, engineers, and consultants.
- Develop detailed project plans, including architectural and engineering drawings.
- Procure necessary materials, equipment, and subcontractors.
- Set up project site, including temporary facilities, safety measures, and logistics planning.
3. Construction Phase:
- Mobilize construction team and assign responsibilities.
- Coordinate with subcontractors, suppliers, and vendors.
- Monitor construction progress and ensure adherence to quality standards.
- Conduct regular site inspections and address any issues or delays.
- Manage project schedule, including tracking milestones and critical path activities.
- Implement safety protocols and monitor compliance.
- Manage project budget, including tracking expenses and cost control.
- Communicate progress to stakeholders through regular updates and meetings.
- Address any changes, variations, or unforeseen circumstances through proper change management procedures.
- Maintain documentation, including daily reports, progress photos, and records of work performed.
4. Project Completion and Closeout:
- Conduct final inspections and ensure compliance with building codes and regulations.
- Complete any necessary testing, commissioning, and certifications.
- Obtain final approvals and sign-offs from relevant authorities.
- Prepare operation and maintenance manuals, as-built drawings, and warranties.
- Coordinate project handover to the client, including training and support.
- Conduct project review and capture lessons learned.
- Finalize project accounts, including financial closeout.
- Celebrate project completion and recognize team accomplishments.
It is important to note that the specific tasks and sequence may vary depending on the size, complexity, and nature of the construction project. The work plan should be customized to align with the unique requirements of the project and the organization's standard project management processes. Regular monitoring, communication, and adjustment of the work plan are necessary throughout the construction project to ensure successful execution and delivery.