City floorspace survey
The Ingleby Trice City Floorspace Survey: monitoring the pulse of City property.
This survey is the only City research published monthly. It provides a touchstone to the day-to-day market by providing reliable long term data to help clients formulate current and future property strategies.
It is reproduced here with the kind permission of Ingleby Trice.
Click here to subscribe to the survey.
Contents |
City Take-up
December 2012
- 301,629 sq. ft (28,022 sq. m)
- This was up compared to the 6 monthly average
November 2012
- 223,840 sq. ft (20,795 sq. m)
- This was down compared to the 6 monthly average
City availability
December 2012
- 7,144,351 sq. ft (663,733 sq. m)
- This was down compared to the 6 monthly average
November 2012
- 7,253,766 sq. ft (673,898 sq. m)
- This was up compared to the 6 monthly average
City fringe take up
December 2012
- 265,138 sq. ft (24,632 sq. m)
- This was up compared to the 6 monthly average
November 2012
- 174,474 sq. ft (16,209 sq. m)
- This was down compared to the 6 monthly average
City fringe availability
December 2012
- 4,803,600 sq. ft (446,269 sq. m)
- There was no change compared to the 6 monthly average
November 2012
- 4,826,394 sq. ft (448,387 sq. m)
- This was up compared to the 6 monthly average
City graph
December 2012
This article is maintained by --InglebyTrice
Related articles on Designing Buildings Wiki
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.