Assignment of choses in action
Choses in action are ‘…all personal rights of property which can only be claimed or enforced by action and not by taking physical possession.’ (ref Torkington v Magee). The term includes the benefits arising under a contract and, subject to certain qualifications, rights of action arising by reason of a breach of contract.
A chose in action can be a legal chose, for example an interim payment due under a building contract, or an equitable chose such as a legacy under a will or an interest in a partnership.
Choses in action can be assigned or transferred unilaterally, for example A the employer enters into a construction contract with B the contractor, requiring B to construct a building to a quality set out in the specification. A can, without the consent of, or indeed knowledge of B, transfer the benefit of that contract to a third party C. A is known as the assignor, B the debtor and C the assignee. Only the benefits of a contract can be assigned, not the burdens (see Nokes v Doncaster Amalgamated Collieries). The burden must be novated.
It is important to understand that the right to assign a chose in action is not derived from contract. It is a statutory right, alternatively a right arising from the rules of equity. Express conditions are commonly found in collateral warranties purporting to grant rights of assignment; these conditions are unnecessary and may actually have the effect of restricting the rights to assign.
[edit] Related articles on Designing Buildings
Featured articles and news
A five minute introduction.
50th Golden anniversary ECA Edmundson apprentice award
Showcasing the very best electrotechnical and engineering services for half a century.
Welsh government consults on HRBs and reg changes
Seeking feedback on a new regulatory regime and a broad range of issues.
CIOB Client Guide (2nd edition) March 2025
Free download covering statutory dutyholder roles under the Building Safety Act and much more.
AI and automation in 3D modelling and spatial design
Can almost half of design development tasks be automated?
Minister quizzed, as responsibility transfers to MHCLG and BSR publishes new building control guidance.
UK environmental regulations reform 2025
Amid wider new approaches to ensure regulators and regulation support growth.
The maintenance challenge of tenements.
BSRIA Statutory Compliance Inspection Checklist
BG80/2025 now significantly updated to include requirements related to important changes in legislation.
Shortlist for the 2025 Roofscape Design Awards
Talent and innovation showcase announcement from the trussed rafter industry.
OpenUSD possibilities: Look before you leap
Being ready for the OpenUSD solutions set to transform architecture and design.
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
Retrofit of Buildings, a CIOB Technical Publication
Now available in Arabic and Chinese aswell as English.
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
Comments
To start a discussion about this article, click 'Add a comment' above and add your thoughts to this discussion page.