Caveat
In the context of the UK construction industry, a caveat is a formal warning or caution expressed within a contract, agreement, or legal document. It serves to alert parties to specific conditions, limitations, or potential issues that might affect the terms and execution of a project. It is essentially a cautionary note, informing one or more parties of certain conditions or potential problems that should be acknowledged and addressed.
Caveats protect the interests of parties by ensuring that certain risks and liabilities are acknowledged and addressed upfront. By clearly outlining specific conditions and limitations, caveats help to clarify the responsibilities and expectations of the parties involved in a construction project. Properly drafted caveats can reduce the likelihood of disputes by making parties aware of potential issues and the agreed-upon handling of those issues.
In construction contracts, caveats can be used to highlight specific risks, exclusions, or conditions that may impact the obligations and liabilities of the parties involved. Including a caveat in a contract can have significant legal implications, as it formally notifies the parties of certain issues, which can affect the enforceability of certain claims or defenses.
Caveats can be used to allocate risks clearly between parties. For example, a caveat might state that the contractor is not responsible for delays caused by unforeseen ground conditions.
A contract might include caveats that exclude certain liabilities or limit the scope of work. For instance, a caveat might specify that the contractor is not liable for defects arising from materials supplied by the client. Caveats can also specify conditions that must be met before certain obligations come into effect. For example, a caveat might state that the start of construction is contingent upon obtaining all necessary permits and approvals.
A caveat might require one party to notify the other of specific issues within a certain timeframe. For example, a contractor might be required to notify the client of any discrepancies in the project drawings within seven days of discovering them.
Examples of caveats in construction contracts might include
- "The contractor shall not be liable for delays caused by unforeseen ground conditions, provided that the contractor notifies the client within 48 hours of discovering such conditions."
- "Commencement of the works is subject to obtaining all necessary planning permissions and regulatory approvals. The client shall bear the responsibility for any delays resulting from the failure to obtain such approvals."
- "The contractor is not responsible for any defects arising from materials specified by the client, provided that the contractor installs such materials in accordance with the manufacturer's instructions."
Caveats serve as crucial tools for managing risks, clarifying contractual terms, and setting expectations between parties. Properly understanding and utilising caveats can help prevent misunderstandings and legal disputes, ensuring a more efficient and collaborative project environment.
See also: Caveat emptor (or ‘buyer beware’).
[edit] Related articles on Designing Buildings
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February