Caveat
In the context of the UK construction industry, a caveat is a formal warning or caution expressed within a contract, agreement, or legal document. It serves to alert parties to specific conditions, limitations, or potential issues that might affect the terms and execution of a project. It is essentially a cautionary note, informing one or more parties of certain conditions or potential problems that should be acknowledged and addressed.
Caveats protect the interests of parties by ensuring that certain risks and liabilities are acknowledged and addressed upfront. By clearly outlining specific conditions and limitations, caveats help to clarify the responsibilities and expectations of the parties involved in a construction project. Properly drafted caveats can reduce the likelihood of disputes by making parties aware of potential issues and the agreed-upon handling of those issues.
In construction contracts, caveats can be used to highlight specific risks, exclusions, or conditions that may impact the obligations and liabilities of the parties involved. Including a caveat in a contract can have significant legal implications, as it formally notifies the parties of certain issues, which can affect the enforceability of certain claims or defenses.
Caveats can be used to allocate risks clearly between parties. For example, a caveat might state that the contractor is not responsible for delays caused by unforeseen ground conditions.
A contract might include caveats that exclude certain liabilities or limit the scope of work. For instance, a caveat might specify that the contractor is not liable for defects arising from materials supplied by the client. Caveats can also specify conditions that must be met before certain obligations come into effect. For example, a caveat might state that the start of construction is contingent upon obtaining all necessary permits and approvals.
A caveat might require one party to notify the other of specific issues within a certain timeframe. For example, a contractor might be required to notify the client of any discrepancies in the project drawings within seven days of discovering them.
Examples of caveats in construction contracts might include
- "The contractor shall not be liable for delays caused by unforeseen ground conditions, provided that the contractor notifies the client within 48 hours of discovering such conditions."
- "Commencement of the works is subject to obtaining all necessary planning permissions and regulatory approvals. The client shall bear the responsibility for any delays resulting from the failure to obtain such approvals."
- "The contractor is not responsible for any defects arising from materials specified by the client, provided that the contractor installs such materials in accordance with the manufacturer's instructions."
Caveats serve as crucial tools for managing risks, clarifying contractual terms, and setting expectations between parties. Properly understanding and utilising caveats can help prevent misunderstandings and legal disputes, ensuring a more efficient and collaborative project environment.
See also: Caveat emptor (or ‘buyer beware’).
[edit] Related articles on Designing Buildings
Featured articles and news
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Home builders call for suspension of Building Safety Levy
HBF with over 100 home builders write to the Chancellor.
CIOB Apprentice of the Year 2024/2025
CIOB names James Monk a quantity surveyor from Cambridge as the winner.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
Treasury responds to sector submission on Warm Homes
Trade associations call on Government to make good on manifesto pledge for the upgrading of 5 million homes.
A tour through Robotic Installation Systems for Elevators, Innovation Labs, MetaCore and PORT tech.
A dynamic brand built for impact stitched into BSRIA’s building fabric.
BS 9991:2024 and the recently published CLC advisory note
Fire safety in the design, management and use of residential buildings. Code of practice.