Carbon emissions reduction target CERT
Contents |
[edit] Overview
The Carbon Emissions Reduction Target (CERT) scheme ran between April 2008 and December 2012 following the Energy Efficiency Commitment 2005-2008. CERT placed a five year commitment on certain electricity and gas suppliers to reduce the carbon emissions within domestic properties.
The main aim of CERT was to contribute to the UK’s commitment to cut greenhouse gases by 12.5% by 2008-2012 under the Kyoto Protocol and Climate Change Act 2008. The overall target was for suppliers to achieve a saving of 293 million lifetime tonnes of carbon dioxide (Mt CO2) by 31 December 2012. By the end of CERT in December 2012, energy companies had achieved a saving of 296.9 Mt CO2 (Ofgem, 2013).
The CERT scheme was followed by The Gas and Electricity (Energy Companies Obligation) Order 2012 (the ECO).
[edit] Background
CERT was implemented by the Electricity and Gas (Carbon Emissions Reduction) Order 2008. Suppliers had to demonstrate that carbon dioxide (CO2) saving measures were being achieved through householders implementing energy efficiency measures.
The energy companies that were obliged to meet the reduction target were:
In addition to the carbon reduction target, the energy companies were required to meet the following three targets:
- At least 40% of the target had to be achieved through uptake by ‘Priority Group’ consumers. These were defined as those aged over 70 years of age or in receipt of certain income-related benefits.
- A saving of 16.2 Mt CO2 had to be met by promotion of energy efficient measures to the ‘Super Priority Group’ consumers. These were defined as those on certain qualifying benefits, for example households in receipt of child tax credits and under an income threshold.
- A saving of 73.4 Mt CO2 had to be met by promoting professionally installed insulation measures.
[edit] Delivery
Ofgem regulated the progress of CERT and reported that 3.9 million homes received professionally-installed loft insulation and 2.6 million households received cavity wall insulation. Other measures implemented included:
- Draught proofing and insulation.
- Shower regulators.
- Solar water heating.
- Small scale combined heat and power (CHP).
- Replacement boilers.
[edit] Scheme outcome
By end of the scheme in December 2012, the energy suppliers had achieved the following (Ref Ofgem, 2013):
- Savings of 296.9 Mt CO2 (equivalent to 101.3% of the overall CERT target). The main target required all the energy companies to meet their main obligations, but two failed and so the main target was not achieved.
- 41.3% of the overall carbon saving was from the Priority Group, against a target of 40%. The Priority Group target required that all energy companies had to meet their Priority Group obligations, but one did not so the target was not achieved.
- Saving of 16.6 Mt CO2 of carbon from the Super Priority Group, which is the equivalent of 102.6% of the 16.2 Mt CO2 target. In order to meet the Super Priority Group target, all energy companies had to meet their Super Priority Group obligations, but one did not so the Super Priority Group target was not met.
- Saving of 75.1 Mt CO2 of carbon (equivalent to 102.3% of the 73.4 Mt CO2 target) by installing measures eligible under the Insulation target. In order to meet the Insulation target, all energy companies had to meet their Insulation obligations, but two failed and so the Insulation target was not met
The majority of carbon saving was achieved through the installation of insulation measures (41%), with lighting measures accounting for 17.3%. Heating savings contributed 10%, appliances 5.9% and the remainder was split between microgeneration and CHP, behavioural measures and demonstration actions.
[edit] Related articles on Designing Buildings Wiki
- Carbon dioxide.
- Carbon emissions.
- Cavity wall insulation.
- Circular Construction in Regenerative Cities (CIRCuIT).
- Climate change act.
- Climate change levy.
- Combined heat and power.
- Green deal.
- Energy companies obligation.
- Insulation.
- Kyoto protocol.
[edit] External references
- The final report of the Carbon Emissions Reduction Target (CERT) 2008-2012, Ofgem 2013.
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.