Build, own, operate and transfer (BOOT)
A build, own, operate and transfer (BOOT) contract is a project delivery model that can be used for large projects developed through Public Private Partnerships (PPPs). The term 'Public Private Partnerships' refers to a very broad range of partnerships in which the public and private sectors collaborate for some mutual benefit.
Under a BOOT contract, a private organisation undertakes to complete a large project, such as a complex infrastructure project, which they are granted a concession to finance and build by a public sector partner, typically a government department. The public partner may provide limited funding or other benefits (such as tax exemptions) but the private organisation accepts most of the risks.
The private organisation is then granted the right to own, maintain and operate the project for a set period of time, during which they can draw fees from users of the asset. Once the time period has elapsed, the control of the project transfers to the public sector partner, either freely or for a fee that is stipulated in the original contract. It is common for the time period to be several decades in the case of big infrastructure projects that carry a lot of construction and operational risk.
There are a number of other, related forms of procurement, which allocate rights and responsibilities differently:
- Build, operate, transfer (BOT), whereby the private organisation does not own the project as an asset, they merely receive a concession to operate it for a period of time. See Build operate transfer BOT.
- Build lease transfer (BLT), in which the public sector partner leases the project from the contractor and also takes responsibility for its operation.
- Design, build, finance and operate (DBFO), which also assigns the design responsibility to the private organisation.
For more information see: Procurement routes.
[edit] Related articles on Designing Buildings Wiki
- Build lease transfer BLT.
- Build operate transfer BOT.
- Complex project.
- Concession.
- Concession agreement.
- Design build finance and operate.
- Design Build Finance Transfer (DBFT).
- Design build operate (DBO).
- Design build operate maintain DBOM.
- Major Projects Authority.
- PFI vs PPP.
- Private Finance Initiative.
- Procurement route.
- Public Private Partnership.
- Public procurement.
- Renovate, operate, transfer (ROT).
- Risk allocation.
Featured articles and news
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.