Glass blowing
Stained Glass Windows: Managing Environmental Deterioration, published by Historic England in 2020, suggests that glass blowing is a: ‘Glass-forming technique, probably developed in Babylonia and the Middle East by the 1st century BC. Molten glass is gathered into a ball on the end of a hollow pipe, and rolled on an iron former to roughly shape it and to slightly cool the surface. Then the pipe is used to blow air into the glass and form it into a bubble. By repeated blowing, shaping and reheating, the glass can be formed in many ways.’
Archaeological Evidence for Glassworking, Guidelines for Recovering, Analysing and Interpreting Evidence, published by Historic England in 2018, defines a blowing iron as: ‘A long iron tube that was dipped into the molten glass to collect a gather for subsequent inflating and shaping.’
It defines optic blowing as a process in which: 'A gather of glass is blown into a mould with a pattern on the inner surface, which transfers to the glass. Continued free blowing results in movement and distortion of the pattern.'
And overblow as: 'A by-product of mould blowing, referring to the glass that remains outside the mould, which is removed and recycled.'
It defines paraison as: 'The partially inflated gather of glass at the end of the blowing iron.'
And paraison end as: 'A marble-shaped blob of glass pinched from the end of the gather during the blowing of particular forms, such as the bowls of goblets.'
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.