Outsourcing operation and maintenance manuals
Contents |
[edit] What is an O&M manual?
Operation and maintenance manuals [O&Ms] provide the information required by end users for the operation, maintenance, decommissioning and demolition of a building. The format and content are typically defined in the Employers Information Requirements [EIRs] of the contact preliminaries documents; typically, under clause A37.
The following is standard content that should be provided in an O&M manual:
- Details of building construction e.g. finishes, cladding, doors
- Requirements for demolition, decommissioning and disposal
- Asset register of plant and equipment
- Manufacturer’s instructions for efficient and proper operation
- Commissioning and testing results
- Guarantees, warranties and certificates
- As-built drawings and specifications
[edit] Why are O&Ms a challenge for contractors?
O&Ms are a prerequisite for practical completion, yet the resource and time required to gather all relevant information is often underestimated or left too late. As a result, clients become disappointed with poor quality O&Ms at handover and will postpone sign off if they deem the O&M Manuals incomplete.
This reflects badly on the contractor and prevents valuable site staff from moving on to future projects as they rectify any problems. This also has a knock on effect for building managers and facilities maintenance teams who are unable to maintain their building efficiently and safely.
[edit] Outsourcing O&Ms
Contractors can produce manuals in house but this may be a distraction from the core task of construction. The cost of outsourcing O&Ms to a specialist provider can be an initial deterrent, particularly if it’s not budgeted for it in the cost plan, but, there are many advantages:
- It eliminates stress at practical completion.
- There may be fewer aftercare calls.
- It ensures there is a realistic budget for O&Ms in cost plans.
The service should Include:
- An agreed process for delivery.
- Chasing and collating project data.
- Structured site review process.
- Handover at practical completion.
- Aftercare hosting and client training.
[edit] What to look for in an O&M specialist
Outsourcing O&Ms should be done as early as practically possible. This enables the specialist provider to follow the construction plan and manage trades as and when they arrive on site.
Key questions to ask any potential provider include:
- Is project handover documentation the sole focus of the company? If not, why not?
- Do they have the relevant experience, skills and resources to handle the project?
- Is the service priced on the amount of work done? If it’s a percentage of construction value, question the relevance of this.
- Is a total management role offered including; site visits, a structured review process, visibility of project progress and so on?
- Can they integrate O&M and asset data with client systems?
- Do they provide an asset register of major plant items as standard?
A specialist provider should outline a fixed, managed process that underpins the way they deliver every project to ensure quality and consistency. This is a total management service to control the flow of information in accordance with your construction programme. It is best achieved through early appointment; chasing all subcontractors, designers and suppliers for information as and when they start on site.
--Createmaster 16:58, 12 Jun 2017 (BST)
[edit] Related articles on Designing Buildings Wiki
- Building log book.
- Building owner's manual - O and M manual.
- Building user's guide.
- Handover to client.
- Health and safety file.
- Maintenance.
- Operation and Maintenance Manuals - Cheap Options.
- Operation, maintenance and training (OMT).
- Practical completion.
- Preliminaries.
- Technical guide.
- Tender documentation.
- Why hard copies of O&M manuals are obsolete.
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.