Advanced nuclear
The Energy White Paper, Powering our Net Zero Future (CP 337), published in December 2020 by HM Government, defines ‘advanced nuclear’ as small modular and advanced modular reactors, where advanced nuclear reactors are ‘Reactors which use novel cooling systems or fuels and may offer new functionalities (such as industrial process heat)’ and small modular reactors (SMRs) are: ‘…usually based on proven water-cooled reactors similar to current Nuclear Power station reactors, but on a smaller scale. They use nuclear fission to generate low-carbon electricity. SMRs are called modular reactors as their components can be manufactured in factories using innovative techniques and then transported to site to be assembled.’
[edit] Related articles on Designing Buildings Wiki
- A zero-carbon UK by 2050?
- Energy white paper.
- Generation nuclear.
- Get ready for green jobs and upgrade projects.
- Hinkley Point nuclear agreement.
- Net zero and green jobs.
- Net zero carbon 2050.
- Not a choice between renewables and nuclear - we need both.
- Organisations prompt government to Build Back Green.
- Power generation.
- Renewable energy.
- The Government's 10-point plan: what's missing?
Featured articles and news
Registered building inspectors
Building types and conflicts of interest updates explaineed.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.