Schedule
In its broadest sense, the term ‘schedule’ simply refers to a list. That can be a list of items, activities, events, information and so on. Sometimes schedules will also include dates, such as the dates on which activities listed in the schedule will be carried out (in the construction industry this is more commonly referred to as a programme). Schedules may be appended to other documents, such as contracts.
A project schedule is a graphic presentation of all activities in a project required to produce the output. Gantt Charts, Network Diagrams, CPM and PERT techniques can be used to create the project schedules.
As construction projects and completed buildings are complicated, they take considerable organisation and can involve a number of different types of schedule. Articles on Designing Buildings Wiki about some of the more commonly used schedules include:
- Activity schedule.
- Call-off schedule.
- Contractor's working schedule.
- Information release schedule.
- Information request schedule.
- Payment schedule.
- Schedule of condition.
- Schedule of accommodation.
- Schedule of defects.
- Schedule of dilapidations.
- Schedule of drawings.
- Schedule of rates.
- Schedule of services.
- Schedule of tender adjustments.
- Schedule of work.
- Scott schedule.
- Window and door schedules
See also: Programme.
Featured articles and news
Wellbeing in Buildings TG 10/2025
BSRIA topic guide updates.
With brief background and WELL v2™.
From studies, to books to a new project, with founder Emma Walshaw.
Types of drawings for building design
Still one of the most popular articles the A-Z of drawings.
Who, or What Does the Building Safety Act Apply To?
From compliance to competence in brief.
The remarkable story of a Highland architect.
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
Comments