Standard Building Contract
The Joint Contracts Tribunal (JCT) was formed by the Royal Institute of British Architects (RIBA) In 1931 when the first JCT standard form of building contract was issued (although the forms were not referred to as ‘JCT’ until 1977). JCT became a Limited Company in 1998. It now produces a range of standard forms of contract for the construction of buildings accompanied by guidance notes and other standard forms of documentation.
The JCT Standard Building Contract is intended for large or complex construction projects, procured via the traditional procurement route, where detailed contract provisions are needed.
The 2016 edition was released on 4 November 2016. New features include:
- Incorporation of the provisions of the JCT Public Sector Supplement 2011.
- Adjustments to reflect the Construction (Design & Management) Regulations 2015 and the Public Contracts Regulations 2015.
- Amendments to the works and existing structures insurance provisions.
- Revision and simplification of the Section 4 Payment provisions.
- Provisions for the grant of Performance Bonds and Parent Company guarantees.
- Revisions to the way the requirements for Collateral Warranties are set out.
- Incorporation of the provisions of the JCT 2012 Named Specialist Update.
The 2016 edition includes the following documents:
- Standard Building Contract With Quantities (SBC/Q).
- Standard Building Contract Without Quantities (SBC/XQ).
- Standard Building Contract With Approximate Quantities (SBC/AQ).
- Standard Building Contract Guide (SBC/G).
- Standard Building Sub-Contract Agreement (SBCSub/A).
- Standard Building Sub-Contract Conditions (SBCSub/C).
- Standard Building Sub-Contract with sub-contractor’s design Agreement (SBCSub/D/A).
- Standard Building Sub-Contract with sub-contractor’s design Conditions (SBCSub/D/C).
- Standard Building Sub-Contract Guide (SBCSub/G).
- Standard Building Contract With Quantities (SBC/Q) Tracked Change Document.
- Standard Building Contract Without Quantities (SBC/XQ) Tracked Change Document.
- Standard Building Contract With Approximate Quantities (SBC/AQ) Tracked Change Document.
[edit] Related articles on Designing Buildings Wiki
- Articles of agreement.
- Collateral warranty.
- Construction contract.
- CPC2013.
- FIDIC.
- Intermediate Building Contract.
- JCT.
- JCT Design and Build Contract.
- Key dates.
- Latham report.
- Management Building Contract.
- Minor works.
- Modifying clauses in standard forms of contract.
- NEC3.
- Procurement route.
- Standard form of contract.
- Sub-contract.
Featured articles and news
The benefits of writing articles for your organisation
How to create a profile for your organisation and publish for free.
No Falls Week. The importance of safe working at height
What to expect and what is on offer to avoid accidents.
Scottish Government action to reach net-zero targets
Retrofit expert group highlight critical actions needed.
A forward thinking, inclusive global community of members.
From engineered product life-spans, to their extension.
Circular economy in the built environment
A brief description from 2021. Where are we now?
Mental Health Awareness Week with ABS
Architects Benevolent Society programme of activity.
CLC publishes domestic retrofit competency framework
Roadmap of Skills for net zero.
May 13-19: Moving more for our mental health.
Understanding is key to conservation.
Open industry engagement survey seeks responses
Institutions and the importance of engagement.
National Retrofit Hub unveils new guide
Digital Building Logbooks and Retrofit: An Introduction.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Electrotechnical excellence, now open for entries.