Concept design report
One of the outputs of the concept design stage is to produce a report which records the design concepts for major aspects of the project that might be worth developing as detailed designs. The report also identifies instructions required from the client.
The concept design report might include:
- The aims and objectives of project.
- A summary of the project brief.
- Areas of compliance and divergence between the concept design and the project brief.
- Identification of constraints, including local context, site levels, access, buildability, manufacturing, financial and local authority planning and building regulations.
- The outcome of key consultations.
- Statement of how the design meets the client's needs.
- Site context and strategy.
- Design and access statement.
- Site layout, including car parking, hard surfaces, water features, art etc.
- Landscape strategy.
- Layout of accommodation, including analysis of adjacencies between functions.
- Sections.
- Elevations.
- 3D visualisations and/or physical models.
- Fire strategy.
- Services strategy including emissions targets.
- Information and communications technology (ICT) strategy.
- Maintenance strategy.
- Quality standards.
- Materials.
- Definition of key construction elements, standardisation and non standard elements.
- Prefabrication and mass production opportunities.
- Long-lead items.
- Proposals for major engineered systems such as: cladding, mechanical and electrical equipment, lifts, and structural frames.
- Potential requirement for specialist design.
- Outline proposals for structural systems and where appropriate method of demolition.
- Outline proposals for building services systems.
- Schedules of accommodation.
- Planning strategy.
- Soft landings strategy.
- Cost plan, providing a break-down of the capital and ‘life cycle’ costs and identifying potential cost problems and cost reduction possibilities.
- Procurement options such as two-stage tendering.
- Programme and phasing.
- Buildability and construction logistics.
- The use of materials and the potential for re-use and recycling.
- Waste handling (see also site waste management plan).
- Sustainability.
- Risk assessment.
- Health and safety issues.
- Areas requiring further research.
- Instructions required.
The concept design report should only include required, or key co-ordinated information and necessary interpretation and should not duplicate information that already exists elsewhere.
Where building information modelling (BIM) is being used, publication of the concept design report may be part of a 'data drop' or 'information exchange' intended to ensure the project is properly validated and controlled as it develops. This may include:
- Models (Industry Foundation Classes (IFC) models and native project information models).
- Data structures (such as COBie files and schedules).
- Reports (typically PDF’s, although native files can be more useable).
[edit] Related articles on Designing Buildings Wiki
- Concept design.
- Concept architectural design.
- Concept architectural design checklist
- Concept services design.
- Concept structural design.
- Constraints.
- Data drop.
- Design and access statement.
- Design methodology.
- Design phase.
- Detailed design.
- Detailed design report.
- End of stage report.
- Gateways.
- Outline planning permission.
- Outline specification.
- Project brief.
- Site waste management plan.
- Soft landings.
- Stage 2 design report.
- Sustainability.
Featured articles and news
Awe-inspiring medieval great barns.
Registered building inspectors
Building types and conflicts of interest updates explaineed.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Comments