Schedule
In its broadest sense, the term ‘schedule’ simply refers to a list. That can be a list of items, activities, events, information and so on. Sometimes schedules will also include dates, such as the dates on which activities listed in the schedule will be carried out (in the construction industry this is more commonly referred to as a programme). Schedules may be appended to other documents, such as contracts.
A project schedule is a graphic presentation of all activities in a project required to produce the output. Gantt Charts, Network Diagrams, CPM and PERT techniques can be used to create the project schedules.
As construction projects and completed buildings are complicated, they take considerable organisation and can involve a number of different types of schedule. Articles on Designing Buildings Wiki about some of the more commonly used schedules include:
- Activity schedule.
- Call-off schedule.
- Contractor's working schedule.
- Information release schedule.
- Information request schedule.
- Payment schedule.
- Schedule of condition.
- Schedule of accommodation.
- Schedule of defects.
- Schedule of dilapidations.
- Schedule of drawings.
- Schedule of rates.
- Schedule of services.
- Schedule of tender adjustments.
- Schedule of work.
- Scott schedule.
- Window and door schedules
See also: Programme.
Featured articles and news
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
Comments