The world's smallest tower crane
The M40R recovery crane is the world's smallest capacity luffing tower crane. The crane is developed by Marr Contracting with its manufacturing partner Favelle Favco. It is designed to remove other cranes from the top of buildings and has the ability to be placed on almost any roof structure.
Uses include lifting building materials such as air conditioning units and cooling towers but is also often used to recover cranes from the top of buildings during construction. The design places smaller loads into existing support structure and allows for slewing coverage and can also be used to erect larger cranes for heavier lifting.
The M40R was initially used to remove the cranes from the top of the 297.3m tall Eureka Tower in Melbourne, Australia.
Lift ability
- Lift capacity: 3 tonnes
- Maximum radius: 15 metres
- Lift/radius ratio: 3 tonnes/ 11 metres
- Capacity: 2 tonnes at 15m radius
- Main winch hoist capacity: 3 tonnes
- Maximum allowable operational wind speed: 20 metres/second
- Compatible with 100% renewable diesel (HVO100)
More information on the M40R capability can be found in the M40R data sheet.
[edit] Related articles on Designing Buildings
Featured articles and news
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building 2024 judges choice winner
Once Upon a Pass by Liam Man.
CIOB Art of Building 2024 public choice winner
Fresco School by Roman Robroek.
HE expands finance alliance to boost SME house building
Project follows on from Habiko public-private place making pension partnership for affordable housing delivery.
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
How orchards can influence planning and development.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.