Integrated project delivery (IPD)
Integrated project delivery (IPD) is a project delivery model built around a collaborative alliance of stakeholders who each share risk and reward. It involves the key project stakeholders (the client, architect, contractor, and so on) entering into a single contract that encourages collaboration, optimises results, reduces waste and maximises efficiency and expertise.
The stakeholders collectively determine project goals, budgets, allocation of risk and compensation. The contract typically specifies the separate responsibilities of the stakeholders but enshrines collective responsibility for the project’s successful delivery.
The IPD contract agreement is typically signed by a ‘leadership team’ comprising the client, lead designer/architect and contractor. They are primarily responsible for delivering the project to the budget, schedule and quality specified by the client. Subcontractors and other stakeholders may agree to become ‘risk/reward partners’ (or they can be contracted on conventional sub-contract agreements).
Risk/reward partners agree to be reimbursed on a cost plus overhead and profit basis if the project performs well. The profit is fixed as a lump sum amount at the point at which the contract amount is negotiated and agreed by the stakeholders. The risk/reward partners may lose some or all of their profit if the project falls behind the budget or schedule, and the contract will lay out the terms of this loss. It is usual for the client to agree to pay for the project at cost if all profit is lost, thereby allowing stakeholders to limit their losses purely to the profit they would otherwise have earned on the project.
The benefit of the IPD method is that the contract removes barriers to collaboration and innovation, combining incentives for the project team as a whole rather than having them seek increased profits from the project individually. Instead of individual successes or failures, the overall outcomes determine the collective rewards.
By openly sharing the project goals, risk and rewards, this can result in a more dependable flow of information between the main parties, leading to a sharing of knowledge and technology. In addition, the project can benefit from being able to adopt lean construction principles, overlapping design and construction phases, and so on.
[edit] Related articles on Designing Buildings Wiki
- Collaborative practices.
- Consortium.
- Construction contract.
- Construction manager at-risk.
- Construction management contract.
- Construction project.
- Design and build.
- Integrated project team.
- Integrated supply team.
- Just-in-time manufacturing.
- Joint venture.
- Kanban.
- Lean construction.
- Managing the procurement process.
- Partnership.
- Procurement route.
- Tender process.
Featured articles and news
BSRIA Briefing 2024: Sustainable Futures speakers
Redefining Retrofit for Net Zero Living 22 Nov.
Wall of support for post-Grenfell regulation of electricians
Call for a shake-up of the construction industry highlighted on radio.
Digital sustainability through future AEC tools
Bringing together industry and academia to meet challenges.
Skills gap for net zero highlighted to Minister for Industry
ECA convenes roundtable discussion at Portcullis House.
Evidencing Net Zero with the new UK buildings standard
Pilot version with detailed excel proforma out now!
Scottish Building Safety Levy, in consultation
From direct remediation and the RPDT, to the costs and alternatives.
Waves of warmer homes grants for the rental sector
Boosting energy efficiency standards for all rented homes.
A refocus of the National Planning Policy Framework
Key terms described in brief, as the consultation closes the evening of the 24th.
Fortified farmhouses of the unruly 16th-and 17th-century borders.
ECA shares advice for those who may be exposed to risks.
How to revolutionise UK housing with MMC
CIC and Supply Chain Sustainability School unveil a plan.
From the UKs largest manufacturer and supplier of lime.
From mud bricks to smart concrete
A brief history from 7000BC to a future on the moon.
Regulator of Social Housing publishes latest fire safety report
Covering remediation of 11 metre plus social housing sector buildings.
Apartment and Duplex Defects Remediation Bill 2024
Approved for priority drafting by Government of Ireland.
The long list with in the frame of key historical events.
Competence frameworks for sustainability in the built environment
Code of practice, core criteria consultation draft for comment.
New Floods Resilience Taskforce
With a wet met office autumn prediction.