Bid evaluation
This article should be read alongside Tender evaluation.
A tender, or 'bid' is a submission made by a prospective supplier in response to an invitation to tender. It makes an offer for the supply of goods and/or services.
Bid evaluation is the process that takes place after the tender submission deadline. It involves the opening and examining of the bids to identify the preferred supplier(s) for the project. Negotiations may then be entered into with one or more suppliers, and the successful supplier awarded the contract.
NB: There may have been a pre-qualification process before bids were invited to reduce the number of potential tenders to those that are genuinely appropriate for the project,
Generally, bid evaluation will be carried out in accordance with evaluation criteria or a selection methodology specified in the invitation to tender. Criteria or other factors that were not included in the invitation to tender should not be used to evaluate bids, and ideally, the same evaluators should evaluate all bids.
Bidding parties should submit clear and well-organised bids, but nonetheless, a great deal of thoroughness is required in the bid evaluation process, to ensure that proposals are properly understood, bids are compliant with invitation to tender, no information is overlooked and that correct conclusions are reached.
An initial review of the offers received is generally undertaken to determine their responsiveness and conformity to the conditions in the invitation to tender documents. Non-compliant bids may be rejected (unless a compliant bid has also been submitted).
A more detailed evaluation of compliant bids may then be undertaken against a number of pass/fail criteria. A technical determination should be made to ascertain whether the bidder’s technical solution is feasible, appropriate and deliverable within certain requirements, i.e. safety and costs. If a consortium has submitted the bid, the proposed project management should be assessed to determine how cohesive it will be in terms of delivering the project.
See Tender evaluation for more information.
There are a number of criteria upon which a preferred bidder can be identified:
- Lowest price
- Most economically advantageous tender (MEAT)
- Mean value
- Exclusion of the extremes
See Contract award for more information.
While it is common for the lowest priced tender to be awarded the contract, other factors – such as relevant experience and the perceived quality of the solution – should also be taken into consideration, as the lowest price does not always result in the best long-term value.
It may be the case that after the initial review only one bid will be sufficiently compliant. The lack of compliance or lack of interest may be because of deficiencies in the tender documents. If this is the case, then the tender documents could be rectified and the tender procedure begun again.
[edit] Related articles on Designing Buildings Wiki
- Best value.
- Best value procurement.
- Bidder.
- Bid writer.
- Competitive tender.
- Construction contract.
- Contract award.
- Contract conditions.
- Contract documents.
- Due diligence when selecting contractors or subcontractors.
- Invitation to tender.
- Letter of award.
- Mid-tender interview.
- Most Economically Advantageous Tender (MEAT).
- Pre-tender interview.
- Procurement route.
- Selection criteria.
- The benefits of e-procurement in construction.
- Tender documentation.
- Tender evaluation.
- Tender processes.
Featured articles and news
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.
Internally insulating a historical building
An experimental DIY approach using mineral thermal lime plaster.
Tree species selection for green infrastructure: A guide for specifiers.
The future of the Grenfell Tower site
Principles, promises, recommendations and a decision expected in February 2025.
Comments
https://autocadfiles.com/amp/residential-house-apartment-design-in-autocad-file-download
Residential House apartment design in autocad file</a> Download file, Bed Room & other room architecture Furniture detail & all interior design, PArking lay-out & Side section & Stair detail.