Smart Export Guarantee SEG
Microgeneration is the small-scale generation of heat and electric power by individuals, small businesses and communities to meet their own needs, as alternatives or supplements to traditional, centralised grid-connected power. |
Contents |
[edit] Introduction
The Smart Export Guarantee (SEG) is a government-backed programme that became available on 1 January 2020. The SEG initiative was introduced in conjunction with the phase out of the Feed-in Tariff (FIT) programme, which was discontinued for new applicants on 31 March 2019.
[edit] Background
The SEG was brought forward by the Department of Business Energy and Industrial Strategy (BEIS) on 10 June 2019. It was introduced by the Smart Export Guarantee Order 2019 - which amended the electricity Supply Licence Conditions (SLCs).
The SEG requires licensed suppliers (referred to as SEG licensees) with at least 150,000 domestic electricity customers to offer at least one SEG compliant tariff to any eligible generators (referred to as SEG generators). Other suppliers may participate on a voluntary basis. A list of mandatory and voluntary SEG licensees is available from the Ofgem site.
To confirm their status, all licensed electricity suppliers must notify Ofgem by 14 February each year. The status of a supplier then applies for the duration of the relevant SEG year (1 April - 31 March).
The announcement from Ofgem explained that the SEG would act as an incentive for both domestic and commercial energy generators able to export electricity up to a capacity of five megawatts (MW) - or up to 50kW for micro-combined heat and power - to the grid. Eligible small-scale low-carbon generators include:
- Solar photovoltaic (solar PV)
- Wind
- Micro-combined heat and power (micro-CHP)
- Hydro
- Anaerobic digestion (AD)
In order to be eligible, generation technology must be installed within Great Britain.
[edit] Payment arrangements
The SEG requires licensees to pay small scale generators for low-carbon electricity which they export back to the National Grid. This arrangement is permitted provided the parties satisfy the rest of the eligibility criteria. For more information, see Guidance for SEG Licensees and Smart Export Guarantee: Guidance for generators.
Licensees dictate the payment rate, the contract length and other terms for generators. There is no prescribed tariff rate, type or length, but the tariff must offer an above zero pence rate per kilowatt hour (kWh) of export at all times in order to be compliant.
SEG generators are paid an export tariff which serves as reimbursement for the electricity that is exported back to the National Grid.
[edit] SEG v FIT
Both the SEG and FIT were introduced to promote commercial and residential investment in renewable microgeneration technology. But the SEG does not directly replace FIT.
One significant difference is that FIT pays for energy generation and export; the SEG only pays for exported energy. However, some licensees do permit generation arrangements to stay in place when generators sign up for the SEG tariff.
Another difference is tariff rate determination. Under FIT, this rate was dictated by Ofgem. With the SEG, it is the licensee that determines this rate.
Those who signed up to FIT prior to its discontinuation in 2019 will continue to receive payments for the duration of their contract.
[edit] Related articles on Designing Buildings Wiki
- Domestic micro-generation.
- Electricity supply.
- Energy harvesting.
- Feed in tariff.
- Microgeneration.
- Microgeneration Certification Scheme 2020.
- Micro-CHP.
- Ofgem
- Power generation.
[edit] External resources
Featured articles and news
Who, or What Does the Building Safety Act Apply To?
From compliance to competence in brief.
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The remarkable story of a Highland architect.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
A new CIOB TIS on discharging CDM 2015 duties
Practical steps that can be undertaken in the Management of Contractors to discharge the relevant CDM 2015 duties.
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.
Access, history and Ty unnos.
The world’s first publicly funded civic park.
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building photo contest 2024 winners
Fresco School by Roman Robroek and Once Upon a Pass by Liam Man.