Smart Export Guarantee SEG
Microgeneration is the small-scale generation of heat and electric power by individuals, small businesses and communities to meet their own needs, as alternatives or supplements to traditional, centralised grid-connected power. |
Contents |
[edit] Introduction
The Smart Export Guarantee (SEG) is a government-backed programme that became available on 1 January 2020. The SEG initiative was introduced in conjunction with the phase out of the Feed-in Tariff (FIT) programme, which was discontinued for new applicants on 31 March 2019.
[edit] Background
The SEG was brought forward by the Department of Business Energy and Industrial Strategy (BEIS) on 10 June 2019. It was introduced by the Smart Export Guarantee Order 2019 - which amended the electricity Supply Licence Conditions (SLCs).
The SEG requires licensed suppliers (referred to as SEG licensees) with at least 150,000 domestic electricity customers to offer at least one SEG compliant tariff to any eligible generators (referred to as SEG generators). Other suppliers may participate on a voluntary basis. A list of mandatory and voluntary SEG licensees is available from the Ofgem site.
To confirm their status, all licensed electricity suppliers must notify Ofgem by 14 February each year. The status of a supplier then applies for the duration of the relevant SEG year (1 April - 31 March).
The announcement from Ofgem explained that the SEG would act as an incentive for both domestic and commercial energy generators able to export electricity up to a capacity of five megawatts (MW) - or up to 50kW for micro-combined heat and power - to the grid. Eligible small-scale low-carbon generators include:
- Solar photovoltaic (solar PV)
- Wind
- Micro-combined heat and power (micro-CHP)
- Hydro
- Anaerobic digestion (AD)
In order to be eligible, generation technology must be installed within Great Britain.
[edit] Payment arrangements
The SEG requires licensees to pay small scale generators for low-carbon electricity which they export back to the National Grid. This arrangement is permitted provided the parties satisfy the rest of the eligibility criteria. For more information, see Guidance for SEG Licensees and Smart Export Guarantee: Guidance for generators.
Licensees dictate the payment rate, the contract length and other terms for generators. There is no prescribed tariff rate, type or length, but the tariff must offer an above zero pence rate per kilowatt hour (kWh) of export at all times in order to be compliant.
SEG generators are paid an export tariff which serves as reimbursement for the electricity that is exported back to the National Grid.
[edit] SEG v FIT
Both the SEG and FIT were introduced to promote commercial and residential investment in renewable microgeneration technology. But the SEG does not directly replace FIT.
One significant difference is that FIT pays for energy generation and export; the SEG only pays for exported energy. However, some licensees do permit generation arrangements to stay in place when generators sign up for the SEG tariff.
Another difference is tariff rate determination. Under FIT, this rate was dictated by Ofgem. With the SEG, it is the licensee that determines this rate.
Those who signed up to FIT prior to its discontinuation in 2019 will continue to receive payments for the duration of their contract.
[edit] Related articles on Designing Buildings Wiki
- Domestic micro-generation.
- Electricity supply.
- Energy harvesting.
- Feed in tariff.
- Microgeneration.
- Microgeneration Certification Scheme 2020.
- Micro-CHP.
- Ofgem
- Power generation.
[edit] External resources
Featured articles and news
A five minute introduction.
50th Golden anniversary ECA Edmundson apprentice award
Showcasing the very best electrotechnical and engineering services for half a century.
Welsh government consults on HRBs and reg changes
Seeking feedback on a new regulatory regime and a broad range of issues.
CIOB Client Guide (2nd edition) March 2025
Free download covering statutory dutyholder roles under the Building Safety Act and much more.
AI and automation in 3D modelling and spatial design
Can almost half of design development tasks be automated?
Minister quizzed, as responsibility transfers to MHCLG and BSR publishes new building control guidance.
UK environmental regulations reform 2025
Amid wider new approaches to ensure regulators and regulation support growth.
The maintenance challenge of tenements.
BSRIA Statutory Compliance Inspection Checklist
BG80/2025 now significantly updated to include requirements related to important changes in legislation.
Shortlist for the 2025 Roofscape Design Awards
Talent and innovation showcase announcement from the trussed rafter industry.
OpenUSD possibilities: Look before you leap
Being ready for the OpenUSD solutions set to transform architecture and design.
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
Retrofit of Buildings, a CIOB Technical Publication
Now available in Arabic and Chinese aswell as English.
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.