Reasons to Specify a Geomembrane Liner Instead of Natural Clay
Contents |
[edit] Introducing liners
When designing a pond or lagoon, preventing leaks is a major concern. However, determining the best geomembrane liner for your project can be an extremely daunting task. You have to decide between reinforced and unreinforced geomembranes, which material and thickness is best, and between a myriad of other physical properties that could play a part in the success of your project. As a result, people often times choose a natural clay liner because it is the less complicated choice.
That being said, natural clay can be a detriment to your pond or lagoon. In some instances, geomembrane liners are installed over the original natural clay after the clay has failed.
[edit] Reasons why geomembranes are the superior liners
[edit] 1. Geomembrane Liners Are More Affordable
When it comes to affordability, there are many factors beside product costs that need to be taken into consideration. Installing natural clay is a difficult and time-consuming process that can cost you much more in labor fees than if you were to install a geomembrane. Natural clay can also be rather expensive to transport to the installation site.
The real cost of a liner system has several components other than material cost. These include costs related to installation, maintenance, repair, longevity of product, terms of warranty, and liability exposure.
[edit] 2. Geomembrane Liners Are More Impermeable
When a pond or lagoon is lined, the goal is to achieve an impermeable containment system. This liner system will prevent hazardous liquid from contaminating and coming in contact with the soil’s water table. Leaks can occur with any material, however, they are much less likely to happen when a geomembrane is specified.
Pond liner is an impermeable geomembrane used for the retention of liquids. Most geomembrane liners are engineered to have an impermeability range of at least 1 x 10-10 to as low as 1 x 10-14, while natural clay can have an impermeability of less than 1 x 10-7. Natural clay is also more susceptible to leaks due to the installation process. Natural clay installations must take into account the following considerations to minimise leakages:
- The slope of the pond or lagoon
- How evenly the natural clay must be spread
- What type of soil the natural clay is being spread on
- The exact chemical makeup of the natural clay
Regardless, the natural clay may have to be reinstalled several times over the years to prevent leaks from occurring or continuing to get worse.
[edit] 3. Geomembrane Liners Have a Proven Track Record
Many geomembrane manufacturers have been in business for at least 30 years and as a result, have proven results for their products. These geomembrane manufacturers will be able to provide you with in-depth knowledge and guidance on pond/lagoon liner applications that you will not necessarily receive from a natural clay provider. The different expert levels comes from the fact that natural clay is not specified as often for lagoons and ponds, so the natural clay providers have less real-life experience. This can be hazardous to your project and budget down the line if a failure occurs with the natural clay.
Overall, geomembrane liners are superior to natural clay when it comes to pond and lagoon liner applications. If you have any specific questions about geomembrane cost, strength, durability, or durability, or would like to discuss your geomembrane project, feel free to contact one of our geomembrane experts.
--Ecogeox
[edit] Related articles on Designing Buildings
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February