Putlog holes
At the Buildwas Abbey in Shropshire, the capital of a column in the north nave shows scalloped decoration. Directly above the column a putlog hole - used for supporting scaffolding during the building - remains. |
Contents |
[edit] Introduction
Putlog holes (also referred to as putlock holes or putholes) are small gaps or recesses incorporated into the construction of a stone or brick wall. Their purpose is to support the short horizontal beams or round poles known as putlogs (or putlocks).
This configuration uses the wall of the structure - along with the putlogs in the putlog holes - to create a type of building platform known as a putlog scaffold. Putlog holes sometimes pass through the entire wall to support the construction of scaffolding on both sides of the wall.
[edit] History
It is believed that this form of scaffolding - originally referred to as socket scaffolding - goes back to early Roman Christian times - perhaps as far back as the fourth century AD. Evidence can be seen in paintings such as the one found on the Hypogeum of Trebius Justus on the via Latina. Within the tympanum of the vault of the tomb is an illustration of workers constructing a brick building using the putlog scaffolding configuration.
Introduced in the 17th century, the terms putlog and putlock have origins in an old masonry phrase used to describe the hole in the wall where workers “put the log” to build the scaffolding during construction. This technique was frequently used to build castles, aqueducts. fortresses and other large structures throughout Europe. The putlog holes - which did not compromise the strength of the walls - remain in many of these buildings.
[edit] Modern putlog scaffolding
In modern construction, putlog scaffolding is sometimes referred to as bricklayer’s scaffolding or single scaffolding (since it is made up of only a single row of standards joined together by ledgers fixed with right-angle couplers). This configuration supports the transverse transoms (or putlogs) which are built into the brickwork bed joints as work proceeds. This type of scaffold can only be used for new works in brick or block.
The holes and logs are sometimes left in the wall after construction is complete. Putlogs that are left behind are sometimes sawn off so they are flush with the wall.
Exterior putlog holes are usually filled in to prevent water penetration. Internal putlog holes are sometimes left unfinished and open.
[edit] Related articles on Designing Buildings Wiki
IHBC NewsBlog
Notre-Dame Cathedral of Paris reopening: 7-8 December
The reopening is in time for Christmas 2025.
Stirling Prize-winning Salford building to be demolished
The Centenary Building will be bulldozed as part of the wider £2.5bn Crescent regeneration project
Volunteers work to transform 100-year-old ‘hidden’ building into bothy
The building, named Druimnashallag, is located southeast of Oban.
The new ‘Arches for HERs’ Demo site, from the Getty Conservation Institute via HE
It shows how organisations responsible for historic environment records (HER) management can benefit from its powerful features.
ICOMOS-CIF 2024 Symposium celebrates 40th anniversary in Venice
It aims to critically review current practices and theories of conservation of built heritage around the world, and more.
HES establishes new national centre for retrofit of traditional buildings
HES plans to develop the centre follows £1m of funding from UKRI Arts and Humanities Research Council.
High Court rejects oral appeal against tower block decision in historic Bloomsbury
The request was for a full Judicial Review hearing against Camden Council’s approval of a 74m-high tower block in Bloomsbury.
Mayor of London and Government announce bold plans to transform Oxford Street
Plans include turning the road into a traffic-free pedestrianised avenue, creating a beautiful public space.
Crystal Palace Subway, for 160th anniversary
The remarkable Grade II* listed Crystal Palace Subway in South London begins a new era following major restoration.
National Trust brings nature back to an area twice the size of Manchester in less than a decade
The National Trust has achieved its aim of creating or restoring 25,000 hectares of priority habitat on its land by 2025.