Concrete boom pumps
This artilce needs more work. To help improve this article click 'Edit this article' above.
Contents |
[edit] Introduction
What follows is a set of some of the important factors that should be considered before conducting a search for a concrete boom pump.
[edit] Volume of pumping
Pumping volume or pumping capacity is one of the most significant parameters for this investment. Fortunately, these pumps can be purchased in the huge range of pumping capacity but you need to understand the theoretical capacity is likely to be on the higher side in relation to real-world conditions. The makers mention ideal pumping capacity - which is tested in standard testing conditions - but this may not match real world conditions. It is best to keep a margin of 10% to 20% when calculating or comparing pumping capacity based on the specifications distributed by the maker.
[edit] Quality of materials
A concrete boom pump is an expensive purchase. It should last several years. Its service life depends, to some extent, on the quality of materials used for making the pump. Components made from lower quality alloys may fail much sooner than expected, resulting in additional investment in repairs and replacement components.
[edit] Related articles on Designing Buildings
Featured articles and news
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.