Productivity in building design and construction
Productivity is the relationship between goods and services produced and the resources used. This concept is critical for the development of any business activity, as those that do not improve their productivity compared to their competitors, are likely to fail.
An increase in production does not necessarily translate into an increase in productivity. To increase productivity, all processes that constitute a company’s activity must be analysed and their efficiency optimised. The resources necessary to increase productivity are:
Capital investment:
- Design of new procedures or improvement of existing ones.
- Installation of more modern machinery or equipment, with a greater capacity or modernisation of existing equipment.
Improved management through a reduction in:
Productivity must not be confused with performance, which is the relationship between forecast and executed work.
Loss in productivity (in terms of time of execution) results from inefficiencies in the total time invested throughout an operation.
The time taken for activities can be broken down into the following:
- Base work content. This is the quantity of work that would be required to manufacture a product or develop an activity if the project were to be perfect, if the procedure, manufacturing or execution method were ideal or if there were no losses in time attributable to any cause. This is the minimum possible time for execution.
- Unnecessary work. This is additional work required due to poor design or specification of the product, or inefficient production or operating methods.
- Ineffective or unproductive time, due to deficiencies in management or deficiencies in workers.
This text in this article is based on an extract from CONSTRUCTION MANAGEMENT, by Eugenio Pellicer, Víctor Yepes, José M.C. Teixeira, Helder Moura and Joaquín Catala. Valencia, Porto, 2008. The original manual is part of the Construction Managers’ Library – created within the Leonardo da Vinci (LdV) project No: PL/06/B/F/PP/174014, entitled: “COMMON LEARNING OUTCOME FOR EUROPEAN MANAGERS IN CONSTRUCTION”. It is reproduced here in a modified form with the kind permission of the Chartered Institute of Building.
--CIOB
NB Social Value and Design of the Built Environment, published by the Supply Chain Sustainability School in 2017, suggests that: ‘Productivity is about doing (or achieving) more with the same. It can relate to financial returns, and also to outcomes such as learning and health.’
Reinventing Construction: A Route To Higher Productivity, published by the McKinsey Global Institute in February 2017, states: ‘…In its purest form, productivity can be described as the output achieved by a given amount of input.’
See also: What is productivity, and how do you measure it?
[edit] Related articles on Designing Buildings Wiki
- Benchmarking.
- Delivering an infrastructure revolution.
- Earned value.
- Identifying the causes of trends in construction labour productivity.
- Key Performance Indicators.
- Productivity in construction: Creating a framework for the industry to thrive.
- Study reveals cost of inefficient contact tracing.
- Tackling the productivity challenge.
- The history of human resource management.
- What is productivity, and how do you measure it?
Featured articles and news
About the 5 Percent Club and its members
The 5% Club; a dynamic movement of employers committed to building and developing the workforce.
New Homes in New Ways at the Building Centre
Accelerating the supply of new homes with MMC.
Quality Planning for Micro and Small to Medium Sized Enterprises
A CIOB Academy Technical Information sheet.
A briefing on fall protection systems for designers
A legal requirement and an ethical must.
CIOB Ireland launches manifesto for 2024 General Election
A vision for a sustainable, high-quality built environment that benefits all members of society.
Local leaders gain new powers to support local high streets
High Street Rental Auctions to be introduced from December.
Infrastructure sector posts second gain for October
With a boost for housebuilder and commercial developer contract awards.
Sustainable construction design teams survey
Shaping the Future of Sustainable Design: Your Voice Matters.
COP29; impacts of construction and updates
Amid criticism, open letters and calls for reform.
The properties of conservation rooflights
Things to consider when choosing the right product.
Adapting to meet changing needs.
London Build: A festival of construction
Co-located with the London Build Fire & Security Expo.
Tasked with locating groups of 10,000 homes with opportunity.
Delivering radical reform in the UK energy market
What are the benefits, barriers and underlying principles.
Information Management Initiative IMI
Building sector-transforming capabilities in emerging technologies.
Recent study of UK households reveals chilling home truths
Poor insulation, EPC knowledge and lack of understanding as to what retrofit might offer.
Comments
To start a discussion about this article, click 'Add a comment' above and add your thoughts to this discussion page.