Micro-grids
Micro-grids are small scale versions of the traditional grid that allow specific local goals to be met. They can be connected to the macro-grid or function independently and typically manage real-time demand, supply and storage of electricity often in a large campus such as a University. A micro-grid can be a well-defined network of physical hardware, generation sources and storage or it can be considered as a local electricity management strategy using existing infrastructure but optimising it to achieve the best local outcome.
Where local generation is available, micro-grids have the potential to improve efficiency by connecting local consumers to decentralised electricity generation (photovoltaic (PV) or other micro- generation technology) and thereby reduce transmission and distribution losses associated with the grid supply. This is particularly applicable where new housing developments are constructed and the appropriate hardware and infrastructure can be installed from new.
In the future, new business models may arise surrounding micro-grids where commercial organisations act as intermediaries and install the necessary hardware to allow a local electricity management strategy to be played out and at the same time negotiate with the electricity supplier on behalf of their consumers.
This article was created by --BRE. It was taken from The future of electricity in domestic buildings, a review, by Andrew Williams, published in November 2014.
[edit] Related articles on Designing Buildings Wiki
- DC isolators for photovoltaic systems (FB 68).
- Electricity supply.
- Feed in Tariff.
- Flexible electrical networks for a low carbon future.
- Glossary of electrical terms.
- Islanded grid.
- Microgeneration certification scheme.
- Mini-grids.
- Solar photovoltaics.
- Smart buildings.
- Smart technology.
- Substation.
- Switchgear.
- The future of electricity in domestic buildings.
- The UK’s low-carbon future is increasingly electric.
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.