Party wall dispute
A dispute in the Party Wall sense of the word need not be much of a dispute at all; even if the Act says it is. Under the Party Wall etc. Act 1996, if an adjoining owner doesn’t consent within 14 days of receiving notice of the proposed works then the parties are deemed to be “in dispute”. The way that disputes under the Act are resolved is by each of the owners appointing a surveyor and those surveyors agreeing the terms of Party Wall Agreement.
Even if the adjoining owner decides to concur with their neighbour’s choice of surveyor as “agreed surveyor” (normally a good decision for minor works) there is still a “dispute” to be resolved so an award must be drawn up and served on the owners.
In effect, what an adjoining owner is saying when they instigate a dispute is that they would like to have their interests protected by a person who understands construction matters and is familiar with the procedures under the Party Wall Act.
It could not be easier for an adjoining owner to instigate a dispute; they need do nothing at all. If Party Wall Notices and Notices of Adjacent Excavation are not consented within 14 days of being received then a DISPUTE has arisen.
The adjoining owner may appoint a surveyor (or concur in the appointment of an agreed surveyor) within the 14 day period but they needn’t rush their decision. Once the 14 days have elapsed they must be sent a follow-up letter asking them to appoint a Party Wall Surveyor within 10 days or risk one being appointed on their behalf by the building owner (the party planning the work). If a building owner does gain the right to appoint a surveyor on behalf of their neighbour that cannot be the same surveyor that they are using; an Agreed Surveyor cannot be appointed unless both owners confirm that appointment in writing.
Once a dispute has arisen both the building owner and the adjoining owner change from being “clients” to “appointing owners” - the terminology reinforces the surveyor’s duty to be impartial. A surveyor can serve notice on behalf of their client because at that stage it is not known whether the adjoining owner will consent or not. If they consent there will be no award and no need for a party wall surveyor.
[edit] Related articles on Designing Buildings Wiki
- 10(4) Party Wall Surveyor Appointments.
- Adjoining buildings definition.
- Adjoining owner.
- Fence.
- Institute of party wall surveyors.
- Line of junction notice.
- Party structure notice.
- Party Wall Act.
- Party wall surveyor.
- Preventing wall collapse.
- Responsibility for boundary features.
- Right of support.
- Trespass.
- Wall types.
- What approvals are needed before construction begins.
- Who Pays for Party Wall Surveyor's Fees?
Featured articles and news
The continued ISG fall out, where to go?
Support for ISG contractors, companies and employees.
New HES national centre for traditional building retrofit
Announced as HES publishes survey results which reveal strong support for retrofit.
Retrofit of Buildings, a CIOB Technical Publication
Expected to become one of the largest activities in the global construction industry.
The ECA industry focus video channel
Keeping update with the industry session by session.
Over 25 recorded informations sessions freely available.
AT Awards 2024 ceremony East London October 25th.
Revisiting the AT community at the 2023 awards evening.
The Community Housing Fund and built affordable homes
CLTN reviews the impact of the Fund and calls for extension.
The grading system of the Regulator for Social Housing
A background, an explanation and ten recent enforcements.
Construction, repair and maintenance. Book review.
Putting new life into a city with a 1900 year history.
BSRIA Briefing 2024: Sustainable Futures speakers
Redefining Retrofit for Net Zero Living 22 Nov.
Wall of support for post-Grenfell regulation of electricians
Call for a shake-up of the construction industry highlighted on radio.
Digital sustainability through future AEC tools
Bringing together industry and academia to meet challenges.
Skills gap for net zero highlighted to Minister for Industry
ECA convenes roundtable discussion at Portcullis House.
Evidencing Net Zero with the new UK buildings standard
Pilot version with detailed excel proforma out now!
Scottish Building Safety Levy, in consultation
From direct remediation and the RPDT, to the costs and alternatives.
Waves of warmer homes grants for the rental sector
Boosting energy efficiency standards for all rented homes.
A refocus of the National Planning Policy Framework
Key terms described in brief, as the consultation closes the evening of the 24th.
Fortified farmhouses of the unruly 16th-and 17th-century borders.