Fire safety articles
- Risk assessment under The Regulatory Reform (Fire Safety) Order 2005.
- The Regulatory Reform (Fire Safety) Order 2005
- Responsible person under the Regulatory Reform (Fire Safety) Order 2005
- Fire safety officer
- Approved Document B (Fire Safety)
- Fire safety design
- Fire safety strategy
- BS 9999: Code of practice for fire safety in the design, management and use of buildings
- The role of codes, standards and approvals in delivering fire safety
- BS 9991:2015 Fire safety in the design, management and use of residential buildings. Code of practice
- Independent review of the building regulations and fire safety
- Concrete and fire safety
- CIBSE updates Fire Safety Engineering guidance
- Hackitt review of the building regulations and fire safety, final report
- International Fire Safety Standards Coalition (IFSS)
- RIBA Plan of Work for Fire Safety
- UK Construction Week report on fire safety
- Fire safety
- Fire Safety Order
- Guide E: Fire Safety Engineering
- Fire compartmentation
- Joint fire code
- Fire Prevention on Construction Sites
- Risk assessment under The Regulatory Reform (Fire Safety) Order 2005.
- Fire door
- Fire damper
- Fire and rescue service
- Fire in buildings
- Fire detection and alarm system FDAS
- Visual alarm devices - their effectiveness in warning of fire
- Fire door inspection scheme (FDIS)
- Fire door inspector
- The Regulatory Reform (Fire Safety) Order 2005
- Fire compartment
- Fire wall definition
- Fire authority
- Fire and rescue authority
- Fire protection engineering
- Fire doors in buildings
- Fire and smoke damper
Featured articles and news
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.