[edit] Introduction
The International Levee Handbook, published by CIRIA in 2013, defines barrage as a: "Structure built in an estuary with the specific intention of preventing, or in some way modifying, tidal propagation.”
[edit] Types of barrages
[edit] Tidal barrage
A barrage may also be referred to as an estuary barrier or coastal barrier. It may be constructed to assist with irrigation or it can generate hydroelectricity by harnessing tidal power. These types of barrages may be referred to as tidal barrages.
[edit] Barrage dam
Barrages that are used as diversion dams (sometimes referred to as barrage dams) may be controlled by gates that are opened or closed in order to control water levels. The gates are constructed between piers that are used to control the load and pressure of the contained water.
Barrage dams are frequently constructed near the mouth of large, winding rivers. They are generally built on flat terrain.
Barrage dams primarily divert water and tend to raise water levels by relatively small amounts (such as one metre). Unlike conventional dams, they do not hold large amounts of water in reservoirs.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.