Declaration of non-collusion
As part of a selective tendering process, tenderers may be required to complete a ‘Declaration of Non-Collusion’ (sometimes referred to as a ‘Declaration of Non-Collusion Form’ or a ‘Certificate of Non-Collusion’).
This is intended to prevent corruption in the tender process by requiring a declaration from the tenderer that they have not colluded with any other party in the preparation of their tender.
The declaration may require that the tenderer confirms that:
- Their tender is bona fide.
- They have not colluded with any other party to fix or adjust the tender price.
- They have not communicated the tender price or terms to any other party (other than where this is necessary to prepare the tender).
- That they have not entered into arrangements with other parties not to tender, or to tender a certain price or terms.
- That they have not given inducements or rewards to the client or their representatives.
- That similar non-collusion arrangements will be required from their sub-contractors and suppliers.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Awe-inspiring medieval great barns.
Registered building inspectors
Building types and conflicts of interest updates explaineed.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Comments
To start a discussion about this article, click 'Add a comment' above and add your thoughts to this discussion page.